An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICAO WGNNew Orleans 10-19 Nov 2004

  2. Contents • Programme Overview • Incentives and a Mandate • Issues • Conclusion

  3. The LINK 2000+ Programme • Co-ordinating the implementation of en-route CPDLC (ACM, ACL, AMC, DLIC) over ATN/VDL2 . • Providing a migration path for legacy data link services from ACARS to ATN/VDL2. ProgrammeObjectives data link to supplement voice

  4. Do we need CPDLC? YES CASCADE: +?% RNP RNAV: +?% LINK: +11% Mode S: +5% 2015: +50% 2010: +24%

  5. Do We Have a Business Case? YES • LINK CBA - Recently Updated confirming previous conclusions • Sensitivity Analysis: key uncertainties are clear. • Risk Analysis: does not show any risk of loosing money for both ANSP and Airline • All CBAs conducted for CPDLC implementation show a compelling case for both airlines and ANSPs • All CBAs have been based on conservative assumptions, steadily refined with the use of more accurate input data • CPDLC is a very cost effective capacity enabler http://www.eurocontrol.int/link2000/files/LINK%202000+%20CBA_Review_2_0.pdf

  6. ENAV ACC Implementations • Maastricht UAC: • since June 2003 • Karlsruhe UAC (DFS) • 2007 • Canarias ACC (Aena) • 2006/2007 • Reims ACC (DNA) • 2006/2007 • Roma ACC (ENAV) • 2006/2007 • Lisboa ACC (Nav Portugal) • 2006/2007 • Switzerland UAC (skyguide) • 2006/2007 • Shannon UAC (IAA) NEWLY JOINED Ground implementation proceeds LINK area upper airspace: 2008

  7. Lufthansa Aircraft Equipage • 20 B737 NG now • 13 B767 now • 5 A300-600ST 3rd Q 04 • 20 A320 1st Q 05 • 19 B737 NG Certified • 15+ A310 1st Q 05 • 20 B737 1st Q 05 • 2 B737 1st Q 05 • 20 A320 end 06 Airborne implementation has started Generating more than 170,000 CPDLC flights/year Discussions with others ongoing

  8. A Three-step Approach • Pioneers • Objective: 100+ aircraft equipped. • Incentives • Objective: more than 25% of flights equipped by 2007 through route charge modulation in LINK airspace. • Mandate • Objective: more than 75% of flights equipped at the end of the decade. PioneersIncentivesMandate 1 2 3

  9. The Mandate • Mandatory Carriage • ENPRM in 2004 • SES Process (via ICB) • Upper Airspace of the “LINK area” • Mandate for ACCs and new aircraft: 2009 • Mandate for old aircraft: 2014 ENPRM ApprovedIATA/AEA • Exemptions • State Aircraft • FANS 1/A long haul • Usual exemptions

  10. Reduced ANSP cost • Better flight profiles • Less misunderstandings • Higher Productivity • Less delay Equipage=Benefits Incentives 2 equipage Mandate 75% Pioneers 25% 2006/7 2009 2014

  11. Incentives 2 • The principles • equipped aircraft → less workload → lower costs • cost savings returned to equipped aircraft • full cost recovery maintained • Options • Route charge Reduction (e.g. 2%) for equipped compensated increase for non-equipped • Investment grant • innovation fund contributes to equipage costs • ultimately funded by route charges • cost may be deferred by borrowing • Differential route charges • equipped aircraft pay a lower unit rate • funded by ANSP cost savings • no reduction for non-equipped aircraft innovation RejectedIATA/AEA

  12. LINK Will Deliver • Current plans • 2006: ~7% CPDLC equipped flights • 2009: 25% CPDLC equipped flights • 2014: 75% CPDLC equipped flights • Benefits • 2006: awareness, experience, inventive use • 2009: capacity benefits are evident • 2014: full capacity benefits > Lower unit rates In a Nutshell