360 likes | 494 Vues
PhD project overview - REMPI analyses of small, iodine containing molecules. Helgi Rafn Hróðmarsson. Presentation overview. Introduction Courses Project overview Publications & conferences Timeline. Experimental Theory (diet) Findings New states State Interactions. Introduction.
E N D
PhD project overview -REMPI analyses of small, iodine containing molecules Helgi Rafn Hróðmarsson
Presentation overview • Introduction • Courses • Project overview • Publications & conferences • Timeline • Experimental • Theory (diet) • Findings • New states • State Interactions
Introduction • Summer internship at Prof. Kvaran‘s research group summers 2009 & 2010. • Study.is – private tutoor since november 2010. • B.Sc. Project under Prof. Kvaran‘s supervision spring 2011. • B.Sc. degree in 2011. • CRI – research & development. • Started as M.Sc. January 2012. • Subsequently switched to PhD. • Plan on finishing late 2015 / early 2016.
Courses • Finished courses • Astrophysics 1 (6 ECTS) • Organic Chemistry 3 (6 ECTS) • Inorganic Chemistry 3 (6 ECTS) • Inorganic Chemistry 3 labwork (4 ECTS) • Mathematical analysis IIIB (6 ECTS) • Mathematical analysis IVB (6 ECTS) • Málstofa (1 ECTS) • Total (35 ECTS) • Courses for this semester • Quantum Physics 1 (8 ECTS) • Computational Chemistry (10 ECTS) • Total (18 ECTS) • Grand total (53 ECTS) • Course next semester • Inorganic chemistry 4 (10 ECTS)? • Málstofa (1 ECTS) • Other interesting courses • Modern optics (8 ECTS) • Quantum Physics 2 (8 ECTS) • Astrophysics 2 (8 ECTS) • Electromagnetism (8 ECTS) • Reading course (10 ECTS)
Project Overview • REMPI of HI • New states • State interactions • REMPI CH3I • REMPI of I2? • More? • Puplished papers • Jingming Long, HelgiRafnHróðmarsson, Huasheng Wang and ÁgústKvaran, "Photofragmentations, State Interactions and Energetics of Rydberg and Ion-pair states: Two Dimensional Resonance Enhanced Multiphoton Ionization of HBr via singlet-, triplet-, W = 0 and 2 states. J. Chem. Phys., 136, 214315, (2012) • Helgi Rafn Hróðmarsson, Huasheng Wang and Ágúst Kvaran, New REMPI observations and analysis.for Rydberg and Ion-pair states of HI. J. Molecular Spectroscopy, 290, p:5-12, (2013) • In preparation • Helgi Rafn Hróðmarsson, Huasheng Wang and Ágúst Kvaran, "Photofragmentations, State Interactions and Energetics of Rydberg and Ion-pair states: REMPI of HI"
Future publications • Paper • i) HI – new states #2 • ii) HI – state interactions #2 • iii) Overview paper summerizing the results of REMPI of HCl, HBr, and HI. • iv) Methodology of spectra assignment for HX‘s? • Timeline • Fall 2013 • Fall 2013 • Spring/summer 2014 • Spring/summer 2014
Future conferences • EFNÍS conference – October 2013 - Reykjavík • Annual meeting of the Spectroscopy and Dynamics Interest Group of the Royal Society of Chemistry – January 2014 – Oxford
The project • Two photon excitation to Rydberg and ion-pair states in HI. • Spectra assignments, location of new spectra, previously unobserved, either or both in absorption spectroscopy and REMPI. • Identification and classification of spectral perturbations (via line shifts, intensity alterations and line width deviation) • Excitations in CH3I • Further specifications in analyses pending. • I2? • Other?
The project • From a chemist‘s point of view. • Molecular orbitals. • HOMO & LUMO
The project • From a physicist‘s point of view. • Hamiltonians • Harmonic oscillator • Rigid Rotor
Findings so far (new states) • New states: • Spectra due to two-photon resonance transitions to Rydberg states not previously detected in REMPI but identified in single-photon absorption studies {k3Π0(ν’ = 1) and k3Π1(ν’ = 1)}. • Spectra due to two-photon resonance transitions to Rydberg states, not previously detected {d3Π0(ν’ = 1)}. • Spectra due to two-photon resonance transitions to ion-pair states, not previously detected in REMPI but identified in single-photon absorption studies {V1Σ+(ν’ = m + 8) and V1Σ+(ν’ = m + 9)}. • Spectra due to two-photon resonance transitions to ion-pair states not previously detected {V1Σ+(ν’ = m + 7)}.
Other findings in our recent publication • Reassignment of the E and H states. • Assignment of the O1Σ+ state. • Off-resonance interactions leading to the „clenching“ of the V(m+8) ion-pair state.
Findings so far (state interactions) – has yet to be published • Both off-resonance and near-resonance interactions between • H1Σ+(1) Rydberg state and the V(m+6) ion-pair state. • O1Σ+(0) Rydberg state and the V(m+7) ion-pair state. • Near-resonance interactions between the I1Δ2(0) Rydberg state and the V(m+9) ion-pair state.
Conclusions • Courses will probably be finished at the end of next semester. • If publications go as planned I will have 4-7 published papers early/mid 2014. • Plenty of other research materials on the horizon. • CH3I. I2? • Something overseas? • Already new states have been found in HI as well as numerous, previously unreported, perturbation effects (whose publication is imminent). • Even more new states have already been observed (which are reserved for the latter publication involving new states in HI).