An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Changes to PTCS Air Source Heat Pump Specifications April 18, 2006 RTF Meeting Bob Davis, Ecotope

  2. Overview of Changes • PTCS Provider requirements/duties enumerated (major addition) • Technician reporting requirements more completely described • Duct location designation made more generic • Controls section slightly expanded and clarified • Refrig. charge section expanded and clarified • Wording changes added throughout to distinguish between new installs and service

  3. PTCS Provider Reqs • Expanded Section 1 • Text addresses PTCS Provider role • Training on specs • Data mgmnt • Tech registry • Data review • Field QA

  4. Duct Language Changes • Section 3.2 • Unconditioned/cond- itioned space language taken out (left up to specific programs to define) • New section 8.2.3 says new duct systems should meet PTCS tightness requirements

  5. Controls Changes/Addition • Was Section 4.3/4.4; now Section 5 • Aux heat staging/sequencing language removed • Added sentence to clearly specify no aux heat allowed in Stage 1 call • Single capacity compressor: added explicit sentence saying discharge air sensor control not allowed • Multi-stage compressor: added option to allow discharge air sensor staging temperature warmer than 85° F (current req) as long as ODT is installed

  6. Refrigerant Checks (formerly Section 5.4, now Section 7) • Complying methods now more specific: • Operating pressures (year-round) • Capacity check (ditto) • Superheat/subcooling (summer) • Documentation • CheckMe • ACRx • New HP start up form • “other approved method”

  7. Summary • Recommend acceptance of revised/amended HP specs • Need to come up with language for dual-fuel “hybrid” systems • Need to revise/amend ground/water-source HP specs