DIRACsecondary Beams

DIRACsecondary Beams. Annual report on Large-area beam tracking detectors for fast extracted beams Task 8 – NUSTAR 3. Participants: Comenius University, Bratislava (leading) GSI, Darmstadt Task leader: Brano Sitar (CUB). Main activities and results o f NUSTAR 3 in 2005.

eilis
Télécharger la présentation

DIRACsecondary Beams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DIRACsecondary Beams Annual report on Large-area beam tracking detectors for fast extracted beams Task 8 – NUSTAR 3 Participants: Comenius University, Bratislava (leading) GSI, Darmstadt Task leader: Brano Sitar (CUB) 19.1.2006, GSI Darmstadt Martin Winkler, GSI

  2. Main activities and results of NUSTAR 3in 2005 • Design, production and testing of a low pressure gas system • Design and production of a prototyp of a proportional beam chamber BC with delay line • Design and production of new electronics for the BC chambers • In time with Implementation plan of Task 8 - NUSTAR 3 19.1.2006, GSI Darmstadt Martin Winkler, GSI

  3. Low pressure gas system • Gas system was built and tested (at the FRS) • Tests showed high precision and reliability Front panel of the control system Scheme of low pressure gas system 19.1.2006, GSI Darmstadt Martin Winkler, GSI

  4. New generation of a Time Proportional Chamber (TPC) for ion tracking • TPC with new designed C-pad read out was designed • New TPC is providing two point on the track in each dimension • High precision integrated delay lines were used TPC Field cage with 12 x 24 cm sensitive area Calibration tool for TPC TPC View 19.1.2006, GSI Darmstadt Martin Winkler, GSI

  5. New integrated electronics for TPC and BC chambers • New integrated electronics was designed and produced • New electronics for readout of 128 channels of BC chambers was obtained Integrated electronic module Readout for 128 channels of the BC chambers Test bench for delay lines 19.1.2006, GSI Darmstadt Martin Winkler, GSI

  6. Work Plan and Financial Status • Personal spent CUB: 20 MM out of 90 MM (no EU request) • GSI: 4 MM out of 6 MM (no EU request) • Capital investment CUB: 10 k€ out of 66 k€ • GSI: no contribution, no EU request • 1 coordination meeting • In time with Implementation plan of Task 8 - NUSTAR 3 • Delivery and Test Experiment with BC prototype in 2006 foreseen 19.1.2006, GSI Darmstadt Martin Winkler, GSI