SuperCDMS SNOLAB Project. Dan Bauer, Project Manager Fermilab, June 14, 2010. Overview of CDMS Projects. SuperCDMS SNOLAB. Aim for x10 further improvement in sensitivity over Soudan Science goal: WIMP-nucleon cross section sensitivity of 3E-46 cm 2

1 / 10

Télécharger la présentation

SuperCDMS SNOLAB Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SuperCDMS SNOLAB Project Dan Bauer, Project Manager Fermilab, June 14, 2010

  2. Overview of CDMS Projects

  3. SuperCDMS SNOLAB • Aim for x10 further improvement in sensitivity over Soudan • Science goal: WIMP-nucleon cross section sensitivity of 3E-46 cm2 • New experimental setup at SNOLAB in Canada • X3 deeper, so no cosmic neutron background • Whole lab is class-2000 cleanroom • New setup must have lower backgrounds from radioactivity • Goal is to build 100 kg of Ge detectors • These will be of the iZIP (interleaved, double-sided) design • Each detector will be 4” diameter, ~1.3” thick, with mass ~1.5 kg • That means building 75-100 detectors (CDMS II used 30)

  4. Schematic of SuperCDMS SNOLAB

  5. First step – R&D, CD-0 and MIE • R&D for FY2010-FY2011 • Submitted FWPs to DOE • FNAL – Cryogenics, Warm Electronics, Shielding designs • SLAC – Detector development • LBNL – Cold electronics • CD-0 and MIE • Requested CD-0 from DOE by summer 2010 • Requested $19.9M MIE for FY2012

  6. Budget and Schedule

  7. Where do we stand in project planning? • Detailed list of specifications/milestones • http://cdms.berkeley.edu/wiki/doku.php?id=snolab:snolab_milestones • Good start on the WBS • http://cdms.berkeley.edu/wiki/doku.php?id=snolab:snolab_wbs • Project Tools • Budget as Excel database and Pivot Tables • FastTrack Schedule (not yet resource loaded) • DOCDB for documentation • http://supercdms-docdb.fnal.gov:8080/cgi-bin/ListTopics

  8. Missing Elements • Have never done CD documentation before • Risk Registry • Alternatives Analysis • Hazards Analysis • Acquisition Strategy • ES&H Analysis • These things have been discussed in our proposals but not as formal documents.

  9. Project Planning at FNAL • First meeting with project team Apr 29 • Homework assignments • Develop a list of project contacts at each institution. Request a listserv for project management (and later another one that include L2 managers). • Project listserv done. L2 managers still to be identified • Put together an overview of the project with a schematic showing systems. Provide a top-down schedule. • Done • Look into requirements for project engineer • Contact DOE site office to identify who will be responsible for SuperCDMS SNOLAB • Set up area in the Directorate server for SuperCDMS • Find out plans for migrating DOCDB to Sharepoint

  10. The role of SLAC • SLAC will manage the Detector and Software Systems • This is about 2/3 of the Project • They will assist in overall project management (Eduardo do Coutoe Silva as Deputy Project Manager) • Already have substantial project help available • How can we best work together? • Plan to use shared project software • Primavera for schedule/budget, Sharepoint for docs? • Joint project meetings • Monthly for now, weekly after CD-0 • Let’s agree on a meeting time • Monthly, third Wednesday, 10am Central is a bit early for SLAC.