1 / 14

Americas Region Detector Hall CONVENTIONAL FACILITIES AND SITING T. Lackowski

Americas Region Detector Hall CONVENTIONAL FACILITIES AND SITING T. Lackowski. 03/2012 CFS BASELINE TECHNICAL REVIEW. Please excuse use of this Old Drawing .

elsie
Télécharger la présentation

Americas Region Detector Hall CONVENTIONAL FACILITIES AND SITING T. Lackowski

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Americas Region Detector Hall CONVENTIONAL FACILITIES AND SITING T. Lackowski 03/2012 CFS BASELINE TECHNICAL REVIEW

  2. Please excuse use of this Old Drawing 03/2012 CFS BASELINE TECHNICAL REVIEW

  3. ILD 9000 shaft should read 10000 03/2012 CFS BASELINE TECHNICAL REVIEW

  4. Cross Section Thru IR Hall 03/2012 CFS BASELINE TECHNICAL REVIEW

  5. Cross Section Thru • ILD Garage 03/2012 CFS BASELINE TECHNICAL REVIEW

  6. 03/2012 CFS BASELINE TECHNICAL REVIEW

  7. 03/2012 CFS BASELINE TECHNICAL REVIEW

  8. 03/2012 CFS BASELINE TECHNICAL REVIEW

  9. Draft CFS TDR Preparation Schedule • XXX • XXX • XXX 03/2012 CFS BASELINE TECHNICAL REVIEW

  10. 03/2012 CFS BASELINE TECHNICAL REVIEW

  11. 03/2012 CFS BASELINE TECHNICAL REVIEW

  12. Cost of Shaft Excavation • Includes excavation, lining, pre-grouting • Costs are for projected depth • FY 12 dollars • Cost of impact on crown not included • Crown support cost may increase due to stress concentration Shaft Diameter in Meters 03/2012 CFS BASELINE TECHNICAL REVIEW

  13. Detector Hall Excavation • RDR volume = 116,167 CM • Hall as shown = 121, 940 CM • Cranes and Platforms • ILD and SID Platforms in Hall • Additional Crane in Hall • Two 40 Tons, one in each Garage areas • Plus one 40 Tons in IR Region • Additional Cranes in Building • 4000 Ton Main Hoist • Two 400 Ton. One in each Assembly Building • Plus 40 Ton over Cryostat Shaft 03/2012 CFS BASELINE TECHNICAL REVIEW

  14. Catwalks and Access • All platforms and stairs/ladders for the Detector are provided by each detector group • CFS will provide catwalk in IR Hall and access to cranes • Finishes (unless needed for structural support) • Floors • Cast in Place Concrete, Steel Troweled Finish • Walls • Formed Cast in Place Concrete in IR Hall • Shotcrete in Garage Spaces • Roofs • Shotcrete, Rolling Drip Ceilings at shafts • Platforms • Four platforms, two in IR Hall and two at surface to be in CFS costs, including moving system. 03/2012 CFS BASELINE TECHNICAL REVIEW

More Related