1 / 1

Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler

~. ~. ~. Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler. MVDC Coupler. Remote network part Net3. DG. Network parts. Neighbour network. Voltage course Net3 (worst case). w. Before restructuring. Restructured, Power factor control.

elton
Télécharger la présentation

Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ~ ~ ~ Results of 20 kV network restructuring: Dispersed generation (DG) and MVDC Coupler MVDC Coupler Remote network part Net3 DG Network parts Neighbour network Voltage course Net3 (worst case) w Before restructuring Restructured, Power factor control Restructured, Voltage control Fault simulation with DG • Outage time Net 3 • Before restructuring 1,2 h/a • Restructured 0,24 h/a • Restr. & automated 0,03 h/a Synchronous DG – stable continuation Converter connected DG – Synchronisation after fault! Automated sequences required!

More Related