Global Precipitation Measurement (GPM) Mission Data and Data Access

Global Precipitation Measurement (GPM) Mission Data and Data Access NASA Precipitation Processing System (PPS). Erich Franz Stocker ( erich.f.stocker@nasa.gov ) PPS Project Manager/Software Architect GPM Deputy Project Scientist for Data. GPM Key Data Dates.

eman
Télécharger la présentation

Global Precipitation Measurement (GPM) Mission Data and Data Access

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Global Precipitation Measurement (GPM) Mission Data and Data Access NASA Precipitation Processing System (PPS) Erich Franz Stocker (erich.f.stocker@nasa.gov)PPS Project Manager/Software ArchitectGPM Deputy Project Scientist for Data

  2. GPM Key Data Dates • February 28, 2014 3:30AM (JST) GPM Core Observatory launch from Tanegashima Space Center, Japan • March 4, 2014 GMI commanded to science observation mode and first data received • March 8, 2014 DPR commanded to science observation mode and first data received • March 21, 2014 GMI L1, L2 near-realtime (NRT) and L1, L2, L3 science standard data made available to set of early data adopters • April 2, 2014 DPR L2 NRT and L2 and L3 science standard data made available to set of early data adopters • April 2, 2014 Combined GMI/DPR L2 NRT and L2 and L3 science standard data made available to set of early data adopters • Current GMI, DPR and Combined data version is V01D both NRT and standard science

  3. Data Release • End of June 2014 GMI data release to the international Precipitation Measurement Missions (PMM) science team • End of July 2014 DPR data release to the international PMM science team • End of August 2014 General public release • End of November 2014 General public release of new merged radiometer product (IMERG)

  4. NRT GPM Core Data Products

  5. 1CR

  6. NRT Constellation Products

  7. Standard GPM Core Science Swath Products * Gorbit is the GPM orbit calculated from the southern most point back to the southern most point

  8. Standard GPM Core Gridded Products

  9. Standard Constellation Data Products

  10. Status of GPM Data Products-1 • Geolocation • Location on the ground reported within requirements • On April 19 Attitude Control System engineers reported an alignment error between start tracker and spacecraft leading to ~0.3 degree peak to peak attitude error (mostly roll) • This does have an impact on incidence angles which affect Tb calculation • New table scheduled to be uploaded April 25 • Data products will be adjusted as part of reprocessing for the PMM data release • GMI L1 products • Reasonably well calibrated (meets requirements specifications) • Small calibration changes in April that included in version V01D • Close to TMI calibration • Some RFI issues in 10 GHz and 18GHz channels (approach to flag and mitigate currently being examined.) • GPROF retrieval products • Saw more specific information in Dr. Kummerow’s presentation • Currently using initial non GPM a priori databases • New database approach for over land retrievals working reasonably well • Currently producing GPROF retrieval for partner imagers and testing sounders • Early state: some areas during really well and others not • Will need about one year of stable GMI L1C and GMI-DPR Level 2B data to establish physically based a priori databases for the GPROF retrievals for the radiometers

  11. Status of GPM Data Products -2 • Ku/Ka L1B –radar powers • Have completed several external and internal calibrations • Have verified phase shifter commands • Reasonably well calibrated for this stage of the mission • Providing acceptable input for the radar L2 algorithms • Ku/Ka/DPR-retrievals • L2 are providing reasonable retrievals again at the early stage where better in some areas than in others • Matching of Ku/Ka pixels working • Some issues are being worked by JAXA engineers and DPR algorithm team • Combined GMI-DPR • Very early stage of development • Working on dealing with data input issues • Currently still in the experimental stage • IMERG (merged radiometer product) • Not being currently produced • Need stable GPROF retrievals for sounders as well as imagers • Currently in internal testing • Usually lags 3 to 4 months after stable L2 GPROF retrievals.

  12. Sample Images of GMI and DPR

  13. GPM Special Products • Daily gridded text products (like TRMM 3G68) • 0.1 deg x 0.1 degree • Contains: • GMI GPROF surface precipitation • Ku near-surface precipitation • Ka near-surface precipitation • DPR match swath near-surface precipitation • GMI-DPR Combined surface precipition • ASCII with line terminator being LF character • GIS compatible files for IMERG • TIFF (precipitation) with world files for metadata • Precipitation in TIFF is scaled integer • Half-hourly, 1day, 3 day and 7 day accumulations

  14. Accessing GPM Data • Must register an email. • registration.pps.eosdis.nasa.gov • Receive an email and click to confirm • Can specify interest in either standard science, NRT or both • Can do ftp to the archive using your registered email as user name and password • Can use a query/order web interface • storm-pps.gsfc.nasa.gov or storm-pps.pps.eosdis.nasa.gov • Can query, place orders for specific products, or establish standing orders which will be fulfilled as products are generated • Can subset swath products and get only the subsets specified • Geographically • Parameter (e.g. just include geolocation and surface precipitation) • Or both together • Currently limited as to the number orderable to keep within scope • Can establish standing orders for subsets • Can see browse images of the orbit to help in ordering decisions • Can look through the data product online • File specifications and algorithm theoretical basis documents (ATBD) • pps.gsfc.nasa.gov/GPMprelimdocs.html

  15. Tools and Services • THOR • Tool for looking at GPM data products • Includes functionality for making images including 3D images • IDL based but IDL not required • Available for: Linux, Windows, Mac OS • http://pps.gsfc.nasa.gov/thorrelease.html • Subsetting available for multiple years (STORM currently limits) • erich.f.stocker@nasa.gov • Carol.L.Archambeault@nasa.gov • Includes setting up subsets to support field campaigns • 3 Hr Presentation (Data and data access) • Includes • More detailed data description,strengths,limitations and status • HDF5 format and tools for accessing • Useful documentation • Accessing data including the writing of scripts for automated access • Use of THOR, STORM • Can with planning offer the tutorial at Universities and agencies • After a couple of presentations to get user feedback will package the presentation • Contact: erich.f.stocker@nasa.gov