1 / 14

HIGH SPEED LIGHTERAGE ASSULT CONNECTOR

HIGH SPEED LIGHTERAGE ASSULT CONNECTOR. JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005. Dan McCluskey NAVFACHQ. Agenda. Current Lighterage Future Lighterage Requirements Seabasing Requirements R&D Efforts Questions. NL - Legacy

emily
Télécharger la présentation

HIGH SPEED LIGHTERAGE ASSULT CONNECTOR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIGH SPEED LIGHTERAGE ASSULT CONNECTOR JOINT SEABASED THEATRE ACCESS WORKSHOP FEBRUARY 9-10 2005 Dan McCluskey NAVFACHQ

  2. Agenda • Current Lighterage • Future Lighterage Requirements • Seabasing Requirements • R&D Efforts • Questions

  3. NL - Legacy Speed – 3 Kts Capacity – 205 LT <1 ft freeboard INLS 2005 to 2025 Speed – 10 Kts Capacity – 300+ LT 4 ft freeboard Current Lighterage

  4. Future Lighterage Requirements N42/N75 tasked Sealift Support Program Office (SSPO) to evaluate next generation lighterage to support MPF(F) and SeaBase

  5. SEABASING REQUIREMENTS • Transport 1 Mechanized Battalion Landing Team to the beach in an 8 hr period from a distance of between 25 and 100 nm. Air Surface Future-TBD Strategic Airlift Strategic Sealift APOD INTRA-THEATER CONNECTORS (ADV BASE-SEABASE) SPOD CONUS High Speed Sealift (HSS) Sea Base INTER-THEATER CONNECTORS (CONUS-SEABASE) Military/Commercial Re-supply Austere SPODs Shuttle Ships High Speed Connectors (HSC) Intermediate Log Source Joint Operations Area Advanced Base Strategic Airlift Heavy Lift Aircraft Strategic Sealift Sea Base leverages forward deployed, pre-positioned, and surge force posture. Arrive ready with scalable air, maritime, and ground forces on accelerated timelines.

  6. Lighterage R&D Efforts • Need to increase lighterage speed • Speed requirements need to be determined based on distance and number of craft to be carried • Study conducted by NSWCCD Combatant Craft to increase speed of INLS causeway ferries • Study completed Oct 04 • Approaches • Increased main propulsion power • Change from 360o waterjet to conventional propellers • Reduce wave making resistance - bow shape improvement • Reduce frictional resistance - air cushion options

  7. Lighterage R&D Efforts • Analysis – Larger Main Engines • Increasing the engines from 800 hp to 1200 hp will increase the speed approximately 1 knot

  8. Lighterage R&D Efforts • Analysis – Change to Conventional Propellers • More efficient than waterjets • Will increase speed by about ½ knot

  9. Total Resistance Frictional Resistance Lighterage R&D Efforts • Analysis – Reduce Resistance Friction • Frictional resistance is only a small portion of total resistance • Large resistance due to gaps between the modules

  10. Lighterage R&D Efforts • Need to reduce total resistance by using air cushion hull form • Partial Air Cushion Support Catamaran (PACSCAT) chosen • Designed for Moderate Speed and Moderate Payload vice High Speed Low Payload for other concepts (ie surface effect ships) • Concept designs used same dimensions as INLS • Would require hull shape redesign • Analysis then Model Testing of PACSCAT INLS

  11. Lighterage R&D Efforts • PACSCAT Model Testing of Modified INLS Hull Shape

  12. Lighterage R&D Efforts • Results of Model Testing • Speed at full load increased by only 1 knot using PACSCAT technology • At full load, the PACSCAT was operating at too high a cushion pressure • Large resistance caused by gaps between modules. Future would require methods to cover gaps • Larger craft (92’ X 28’) would reduce cushion pressure and increase speed

  13. Future R&D Efforts • Determine seabasing mission requirements re speed and payload • Evaluate single hulled craft vice connected barges • Look at various methods to increase speed to meet mission requirements, ie hull form, propulsion • Look at various options to launch, ie FLO/FLO, LO/LO, Preposition • Evaluate INLS Floating Causeway as a portable/beachable pier to permit offload of intra-theater connectors near the beach without requiring an intermediary platform • Continuation of a multiyear SBIR contract • Concept Development and Design • Prototype Detailed Design • Prototype Production and Test