1 / 15
STAKEHOLDER PRESENTATION 3RD November 2011 Engineering Designs and Construction EDC
150 likes | 405 Vues
. Galeota Port Development Status. CONTENTIntroductionServices Required at GaleotaMandateScope of WorksContracts Awarded/ExpenditureAccess and Possession of SiteDelays ScheduleBudgetary RequestsSocioeconomic Impact. Galeota Port Development ProjectIntroduction.
Télécharger la présentation
STAKEHOLDER PRESENTATION 3RD November 2011 Engineering Designs and Construction EDC
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
1.
STAKEHOLDER PRESENTATION
3RD November 2011
Engineering Designs and Construction (EDC)
2.
3.
Galeota Port was built in 1971 for AMOCOS East Bloc exploration.
Port Condition
Needs major repairs
Has shallow draft (4m max),
NECs vision is for a modern, sustainable, specialized port facility serving the national interest with regards to the operations of the oil majors.