1 / 15

STAKEHOLDER PRESENTATION 3RD November 2011 Engineering Designs and Construction EDC

. Galeota Port Development Status. CONTENTIntroductionServices Required at GaleotaMandateScope of WorksContracts Awarded/ExpenditureAccess and Possession of SiteDelays ScheduleBudgetary RequestsSocioeconomic Impact. Galeota Port Development ProjectIntroduction.

emma
Télécharger la présentation

STAKEHOLDER PRESENTATION 3RD November 2011 Engineering Designs and Construction EDC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. STAKEHOLDER PRESENTATION 3RD November 2011 Engineering Designs and Construction (EDC)

    2.

    3. Galeota Port was built in 1971 for AMOCOS East Bloc exploration. Port Condition Needs major repairs Has shallow draft (4m max), NECs vision is for a modern, sustainable, specialized port facility serving the national interest with regards to the operations of the oil majors.

    4.

More Related