An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vertically Integrated Optical Testbed for Large Applications in DFNImplementation of a testbed for optical networking as a cooperation of industrial and research partners Peter Kaufmann (DFN-Verein)Kaufmann@DFN.DEFerdinand Hommes (FhG/IMK)Ferdinand.Hommes@IMK.FRAUNHOFER.DENovember 2005www.viola-testbed.de VIOLA Heanet, November 2005 P.Kaufmann/DFN

  2. Project and Partners • Organized as consortium, Leader: DFN-Verein • Members of consortium: • Alcatel SEL AG, T-Systems International GmbH, • Siemens AG, FhG (IMK, SCAI), • FZ Jülich, Stiftung caesar, • Univ. Bonn, FH Bonn-Rhein-Sieg (U Appl. Sc.) • RWTH Aachen • Associated partner: GasLINE, Navtel, Univ. Erlangen • Term of Project: 3 Years • Start of VIOLA: June 2004 • Funding: ca. 11 M€ from BMBF (Ministry of Research) • Total costs: ca. 20 M€ Heanet, November 2005 P.Kaufmann/DFN

  3. General Goals (1) • Test & evaluation of current developments of netwoking technology including signalling & management • State-of-the-art (pre-)products of industrial partners • Signalling mechanisms and interfaces • Wide area field tests, laboratory environment for specific tests • Preparation for X-WIN of DFN (successor of G-WIN) • Call for tender for fiber+WDM late 2004; implementation since Summer 2005; • Implementation of (new) routing/switching equipment in 2006/07; • Implementation as a stepwise process with increasing service complexity; • Implementation of a vertical testbed • Applications • Middleware tools • Optical transport technology for IP, SDH and GE Heanet, November 2005 P.Kaufmann/DFN

  4. Testbed Topology Heanet, November 2005 P.Kaufmann/DFN

  5. Components & Connections Heanet, November 2005 P.Kaufmann/DFN

  6. Equipment (1) • Equipment and Connectivity offers: • Different SDH-domains • In triangel in parallel with up to 10 Gbps: • SDH-connectivity and • L2-Ethernet-connectivity • User access with n * GE • e2e-connectivity via L2-service or via L2/SDH-service Heanet, November 2005 P.Kaufmann/DFN

  7. Equipment (2) • Alcatel 1678 (SDH-Cross-Connect) • Interfaces: up to 10 Gbps-SDH (STM-64) and GE, with GFP • Signalling: OIF/UNI-N 1.0 R2 and E-NNI • Alcatel 7750 SR (Router) • Interfaces: up to 10 Gbps-SDH, GE and 10GE, L2-Service: VPLS (H-VPLS) • Riverstone 15008 (GE-Switch) • Interfaces: GE and 10GE, L2-Service: VPLS (H-VPLS) • Siemens SURPASS hiT 7070 (SDH Cross-Connect) • Interfaces: up to 10 Gbps SDH (STM-64) and GE, with GFP • Signalling: I-NNI, Cross-connect capacity: 160 Gbit/s • Siemens/Sycamore Networks SN16000 (SDH Cross-Connect) • Interfaces: up to 10 Gbps SDH (STM-64), • Signaling: E-NNI, I-NNI, OIF/UNI 1.0 R2, Cross-connect capacity: 2.5 Tbit/s Heanet, November 2005 P.Kaufmann/DFN

  8. Network Signalling (1) Applications GRID Virtual Reality Layer 2 Services Layer 3 Services Layer 3 VPNs VPLS/HVPLS Layer 2/3 Switch/Router GFP/LCAS SDH Cross Connects MPLS GMPLS / UNI / I-NNI / E-NNI DWDM CWDM Fiber (GMPLS , all optical Switch) Heanet, November 2005 P.Kaufmann/DFN

  9. Network Signalling (2) • Interworking in optical transport networks Signalling concepts: analysis and test them, contribution to specification • GMPLS for IP-based control plane (IETF) • ASON / ASTN (Automatic Switched Optical/Transport Network, ITU) • UNI for user controlled signaling and E-NNI (Optical Internetworking Forum, OIF) • Interoperability at UNI/NNI (OIF) • I-NNI-GMPLS-Interface Heanet, November 2005 P.Kaufmann/DFN

  10. Network Signalling (3) • First Signalling-Results • GMPLS with Soft-Perm-Conn at Alcatel-CC1678 in operation • OIF-E-NNI at Alcatel-CC1678 and Sycamore-CC SN16000 available • OIF-UNI 1.0,R2, network side at Alcatel-CC1678 available • OIF-UNI 1.0,R2, network side at Sycamore-CC-SN16000 available • OIF-UNI 1.0,R2, client side: Late 2005 • OIF-UNI 2.0, planned for 1Q 2006 at Alcatel and Siemens CC • Interworking tests of OIF-E-NNI between Alcatel-CC1678 and Sycamore-CC-SN16000: some problems (interpretation of Unicast/Multicast OSPF-Packets when using IP-tunnels) Heanet, November 2005 P.Kaufmann/DFN

  11. Network Signalling (4) • Provision of Ethernet-Service over SDH with bandwidth adjustment (New SDH: GFP, LCAS, VC). • GFP: Generic Framing Procedure(ITU-T G.7042), method to transport data packets (e.g. Ethernet) over SDH • LCAS: Link Capacity Adjustment Scheme(ITU-T G.7041), dynamical bandwidth adjustment for SDH-links (variable VC4-container) • Virtual Concatenation (VC) instead of Continuous Concatenation (CC): VC4-Container may use different ways in the transport network • First New-SDH-Results • Basic tests/interworking between Alcatel-CC-1678, Siemens-CC-hiT7070 and ADVA-GE-MUX-1500 successful • LCAS tests in 4Q 2005 Heanet, November 2005 P.Kaufmann/DFN

  12. Network Signalling (5) • Operation of L2-Subnetworks • VPLS, H-VPLS (Hierarchical Virtual Private LAN Service) • Based on Riverstone15008 and Alcatel-7750, connected via SDH-Equipment (Alcatel-CC 1678) or directly with 10GE-LAN-Phy • Test: Performance, Functionality • First L2-Results • VLL and VPLS: OK • H-VPLS: Problems, Alcatel/Riverstone not fully compatible • Interworking Ether Flow Control between L2/SDH-Switches: OK • QoS-Fkt. for b/w limitations (Shaping,Policing;Ingress,Egress): OK Heanet, November 2005 P.Kaufmann/DFN

  13. Network Signalling (6) Heanet, November 2005 P.Kaufmann/DFN

  14. Network Signalling (7) • Development of interfaces for user controlled signalling Heanet, November 2005 P.Kaufmann/DFN

  15. Project Goal Middleware • Implementation of an operational environment for PC-cluster based on UNICORE • UNICORE supports the operation of a Compute-Grid • Interoperability with Globus-toolkit and compatibility with OGSA (Open Grid Services Architecture) is planned • Development / Portation of missing components • Development of a Meta-Scheduler based on Global Grid Forum Standards (Grid Resource Allocation Agreement Protocol) • Portation of MetaMPI and integration in UNICORE • Adaptation/upgrading of local tools to connect and analyse distributed applications • Development of high-performance parallel-I/O-interfaces (main memory, file server) Heanet, November 2005 P.Kaufmann/DFN

  16. Project Goal Applications (1) • Usage/upgrading of (existing) applications with high and dynamical transfer requirements (e.g. e-science / Grid) • Several GE-tunnels per application • Dynamical requirement of bandwidth with guaranteed QoS • User controlled networks (E2E) • Integration of real users • Variable requir. (time,size,quality) for „stress-test“ of network equipment • Based on experiences with new networks • Creation of new ideas for applications • Motivation of user groups for GRID-technology Heanet, November 2005 P.Kaufmann/DFN

  17. Access of Applications to the Transport Network Heanet, November 2005 P.Kaufmann/DFN

  18. Distribution of Costs/Funding Heanet, November 2005 P.Kaufmann/DFN

  19. International Aspects • DFN participates in EGEE (Enabling Grids for e-science in Europe) • international Grid-Infrastructure based on existing networks • „VIOLA-Participation“ (DFN, TSI, Uni Erlangen) in FP6-projects: • GN2 - Geant2 • MUPBED - Multi-Partner European Testbeds for Research Networking • The testbed VIOLA forms the national base to contribute successfully to international projects • Interested for cooperation with similar projects/activities in Europe and elsewhere Heanet, November 2005 P.Kaufmann/DFN

  20. Status (1) • Testbed implementation was finished early 2005: • circuits are connected (including connection to G-WIN/GEANT) • equipment is installed; • network management is operational • Work items of „Transport & Signalling“ have been started: • I-NNI: Available for Siemens-CC-hiT7070 • E-NNI: Available for Alcatel-CC-1678 and Sycamore-CC-SN16000 • E-NNI interoperability tests between Alcatel & Sycamore • UNI-N 1.0 R2: Available for Alcatel-CC-1678 • GFP/LCAS-Tests between Alcatel-1678 & Siemens-hiT7070 • E2E: Specification of user interface & design of reservation system Heanet, November 2005 P.Kaufmann/DFN

  21. Status (2) • L2-Test/Operation: • VLL/VPLS interoperability tests with Alcatel & Riverstone: OK • H-VPLS interoperability tests with Alcatel & Riverstone: Some problems • Initial version of middleware is deployed, Integration of new middleware components in progress • Application projects have finished preparatory work • First “runs” over the network have been made Applications are beginning to stress network & middleware. Heanet, November 2005 P.Kaufmann/DFN