An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design Of Nablus-West WWTP An-Najah University  Civil Engineering Department Graduation Project #2

  2. Content • Background • Objectives • Population Analysis • Wastewater Generation • Stormwater and Infiltration • SewerCAD Analyses • Waste water treatment plant design • Results and Recommendations

  3. Background • Location Nablus district is located in the northern part of the West Bank. Nablus

  4. Background • Topography Nablus lies in a valley between two mountains, Ebal Mount and Gerzim Mount Ebal Mount • Climate • Climate in Nablus is rainy in winter, hot and dry in summer Gerzim Mount

  5. Background • Precipitation The annual mean rainfall is 664 mm • Humidity The mean annual relative humidity of Nablus district is 62% R H

  6. Objectives • The ultimate goal of this project is to enhance the sanitation sector in the Nablus city, that will lead to: • Prevention of disease and nuisance condition • Providing clean water supply for irrigation • Avoidance contamination of water supply

  7. Objectives • These goals should be established by achieving the following objectives of the project: • Design of wastewater conveyance system • Design of wastewater treatment plant

  8. Study Area Dersharaf Zawata Beitebba Qosin Nablus West Beitwazan East

  9. Population Analysis

  10. Population Analysis

  11. Water Consumption 42.40 m3/year ≈ 120 L/day

  12. Wastewater Generation • Water consumption = 120 L/c.d • Design period = 30 year • Return flow = 80% • Hourly peak factor = 3 • Infiltration = 10% of mean daily wastewater • Stormwater generate only from the old city

  13. Stormwater • Q storm = C × I × A = 3,042 L/s C = 0.9 A = 27.6 ha I = 120 (L/s.ha) Return period = 4 years Rainfall duration = 12 (min)

  14. Wastewater Generation

  15. The Main Trunk

  16. SewerCAD Analyses • Using manning equation in hydraulic analysis • Manning coefficient = 0.013 • Velocity range: 0.5 - 4.5 m/s • All pipes are circular and made of concrete. All diameters are 1.4 m

  17. SewerCAD Analyses

  18. SewerCAD Analyses

  19. SewerCADAnalyses

  20. SewerCADAnalyses Profile section

  21. Design of wastewater treatment plant • Primary • Screening • Grit Removal • Primary sedimentation • secondary • Aeration • Secondary sedimentation • Advanced • Disinfection

  22. Design of wastewater treatment plant

  23. Screening • This is the first step in preliminary treatment process which aims to remove floating and suspended matter such as paper, cloth. • Quantity of screenings = 0.9 m3/day

  24. Grit Removal Chamber • Grit chamber used to remove grit sand and other material manly to protect moving mechanical equipment and pumps from unnecessary wear and abrasion

  25. Primary sedimentation tank • It removes 90% to 95% of settealble solid ,and remove 30% to 40% of BOD also reduce total suspended solid 50% to 70% .

  26. Aeration • Is used to receive the flow from many entrance to prevent the excess concentration of bacteria in one location.

  27. Secondary sedimentation Tank (Biological Process) • The objective of biological treatment is to reduce BOD to be with the standard, using bacteria

  28. Disinfection • The process designed to kill or inactivate most microorganisms in wastewater, including essentially all pathogenic (disease-causing) organisms

  29. Results and Recommendations • The main trunk can carry the wastewater without flooding . • In wastewater treatment plant design we followed a series of processes that helped to achieve the acceptable level of treated waste water.

  30. Results and Recommendations • The outputs of treatment processes are treated water and sludge. The treated water can be used as an irrigation water in wadi al-zomar ,for olive, almonds, that will lead to reduce the amount of pure water consumption for irragation and the extract sludge can also be used as a fertilizers.

  31. THANKSFORLISTENING