1 / 5

Earth Processes and Boomtown’s Coast

Earth Processes and Boomtown’s Coast. Activity 33. To do…. Read C-44 Copy the challenge question. Open to your topographical map of Boomtown (September 12). Draw an arrow representing the flow of sediments: down Rolling River to the beach.

eshe
Télécharger la présentation

Earth Processes and Boomtown’s Coast

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Earth Processes and Boomtown’s Coast Activity 33

  2. To do… • Read C-44 • Copy the challenge question. • Open to your topographical map of Boomtown (September 12). • Draw an arrow representing the flow of sediments: • down Rolling River to the beach. • From the top of the ocean cliff to the base of the cliff near the beach • Label these arrows. • Copy the vocab: • Breakwater: A rock structure parallel to the shore that is used to slow erosion by reducing the wave’s (that hits the shore) energy. • Dredging: Removing earth material from under water. • Jetty: A rock structure built perpendicular to the shore that minimizes deposition in a specific area. • Longshore current: A stream of water in the ocean that runs parallel to the shore. • Seawall: A wall made of rock, concrete, or similar material built along a cliff or shoreline to reduce erosion.

  3. To do… • Listen-Stop-Write procedure • Mr. N. will read the text to you today. You only NEED to listen. You canread alongif you want. • When Mr. N. stops, spend two minutes writing down the main ideas you heard. LSW #1 LSW #2 LSW #3 LSW #4

  4. To do… Copy this table:

  5. To do…

More Related