Gregory Canyon Landfill. Proposed LEA Permit CIWMB Permitting & Enforcement Committee Meeting December 6, 2004. Jack Miller San Diego County LEA. Proposition C. Approved in 1994 by 60% of voters: Amended the local general plan & zoning ordinance to allow a landfill

evangelia
Télécharger la présentation

Gregory Canyon Landfill

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gregory Canyon Landfill Proposed LEA Permit CIWMB Permitting & Enforcement Committee Meeting December 6, 2004 Jack Miller San Diego County LEA

  2. Proposition C Approved in 1994 by 60% of voters: • Amended the local general plan & zoning ordinance to allow a landfill • Required CEQA process and all other applicable permits • Imposed specific mitigation measures • LEA became the CEQA lead agency

  3. Proposition B • Proposed the repeal of Proposition C • Well financed campaigns on both sides • Measure defeated 63% to 37% • A form of public comment

  4. Public Participation and EIR Process • January 1999 circulated Draft EIR for public comment • Available for review in 7 public locations • Copy with printer for public reproduction • Availability advertised in Union Tribune • Public hearing; 125 people participated

  5. EIR process continued • Two additional documents, two additional comment periods • Added Internet and CD availability for revisions • A second public hearings (103 participants) • February 6, 2003: EIR Certified • CIWMB staff concurs that CEQA findings are sufficient and are supported in the record

  6. Benefits Analysis, Findings, and SOC • Project applicant prepared Benefits Analysis (October 2003) • LEA prepared staff report on that analysis • Posted both on website and invited comments • Posted comments and subsequent rebuttal comments on website

  7. Benefits Analysis outcomes • Tentative conclusion: • Project benefits likely to outweigh remaining significant impacts • Detailed work on permit text began • June 2, 2004: CEQA Statement of Overriding Considerations adopted

  8. Permit and JTD • Includes all mitigation requirements as LEA permit conditions • Ensures practical enforceability of 188 mitigation measures adopted in Final EIR • Groups requirements by project phase • GCL will reimburse LEA for oversight costs as lead agency

  9. Permit Development: Drafting • Thorough reviews and consistency checks • CIWMB requirements • EIR descriptions and mitigation requirements • JTD • All issues raised were considered and resolved. Comments helped. • Close coordination with CIWMB staff. • CIWMB staff report concurs: no technical or regulatory issues remain.

  10. Permit process, further steps • June 2, 2004 LEA completed proposed permit and EIR and submitted to CIWMB • GCL agreed with CIWMB request to delay CIWMB hearing until after Proposition B vote • GCL enhanced the project in response to comments and CIWMB / LEA recommendations

  11. Permit process, further steps • Revised Draft Permit reflects some of these enhancements. • Supplemental Statement of Overriding Considerations reflects these enhancements

  12. Summary • Project includes all feasible mitigation: • CEQA, Proposition C, LEA, other Agencies • Project meets all CIWMB requirements • No unresolved technical, regulatory, or mitigation issues • Benefits of landfill outweighs identified unmitigated impacts • Votes on Propositions C and B support this project

  13. Recommendation • This committee should recommend CIWMB concurrence • The CIWMB should concur in the proposed permit