1 / 25

16 DC’s on the support !!

16 DC’s on the support !!. 4 Levels of test Pretest HV Air + tightness Aquarium : functionality + tightness Cosmics Lab : other preamps + correct signal assignment inside COBRA up to panel == preamp calibration Cosmics p E5, with and without COBRA == preamp calibration + alignment.

evita
Télécharger la présentation

16 DC’s on the support !!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 16 DC’s on the support !! DC status, 18.07.2007, je

  2. 4 Levels of test • Pretest HV Air + tightness • Aquarium : functionality + tightness • Cosmics Lab : other preamps + correct signal assignment inside COBRA up to panel== preamp calibration • Cosmics pE5, with and without COBRA== preamp calibration + alignment 17 DC‘s through level 2 + 13 DC‘s through level 3 + 3 DC’s partially level 3 DC status, 18.07.2007, je

  3. Tightness a) Clean old pair with He b) New DC pair in c) Flush with 50%-50% 49.5% • HV in pure He (Aquarium closed) • As above • Flush He in Aquarium • Open Aquarium 48.6 % ~1 % DC status, 18.07.2007, je

  4. a a • Sr90 , slits of > 5 cm • All signals present (anode asymmetry only if up and down) • Circle only with 4 correct cathodes • separation of 2 periods a Assy anodes Assy cath down Assy cath up DC status, 18.07.2007, je

  5. Calibration AsyAn0 = [{(l/2+x)r + R} - {(l/2-x)r + R}] / [{(l/2+x)r + R} +{(l/2-x)r + R}] = 2x / ( l + R/r) AsyCat/(sum anode) = a+bsin(2*pix/period + phase) DC geometry Ok to +-.05 mm Iteratively : a) Project with a and optimize ratio of anode preamp gain or thin slit in the middle b) Fit cathn /(sum Anode) Clever fit like Boris and Sacha DC status, 18.07.2007, je

  6. DC status, 18.07.2007, je

  7. DC status, 18.07.2007, je

  8. DC test with Cosmic ray (in Lab.) DC status, 18.07.2007, je

  9. DC status, 18.07.2007, je

  10. cosmic ray counters for DC wire alignment • 10 counters (10 plastic scintillators + 20 PMTs) are prepared • DC wire alignment will be performed w/o COBRA field DC status, 18.07.2007, je

  11. cosmic ray counter for DC wire alignment (2) • event rate is estimated by MC # of hit / 5 hours • beyond hit rate map is corresponding to 5 hours running • “1 counter hit & 2 DC hit” are required • if we request 10k tracks for 1 wire at least, 90 hours are necessary DC status, 18.07.2007, je

  12. cosmic ray in the COBRA field • event examples μ+ : 746MeV/c μ- : 607MeV/c DC status, 18.07.2007, je

  13. 0 9 1 10 2 11 3 12 4 13 5 14 6 15 7 16 8 17 DC trigger (Michel)== energy and resolution calib. • The definition of the standard Michel trigger : • just requiring the # of hit sector ≥ 4 , does NOT care “inner/outer” e+ inner outer • optional trigger : • (1)standard trigger + 1 hit in the “outer sector” • (2)standard trigger + TC hit (bar & fibre) DC status, 18.07.2007, je

  14. momentum spectra (standard trigger) DC status, 18.07.2007, je

  15. momentum spectra (optional trigger) DC status, 18.07.2007, je

  16. Control of DC geometry • 2 print crosses measured relative to reference bolts in mech. Workshop • Same in COBRA by survey group • On the platform • Without end cap • (next days !) • Without COBRA DC status, 18.07.2007, je

  17. photos DC status, 18.07.2007, je

  18. photos DC status, 18.07.2007, je

  19. Backgrounds • HV units, disappear with linear regulator for low supply • “Front end program”  not polling but online time calibration • Up-down  negligible with better up-down print grounding • print ground to metallic cover of Carbon support • Al contact between frames from up support to down support • Rate (temperature) dependence of DRS calibration  next Chip DC status, 18.07.2007, je

  20. Data reduction reject cells a) peak to peak of anode sum < 2*threshold in time window b) 2 neighbors with peak to peak of anode sum < 2*threshold in time window DC status, 18.07.2007, je

  21. Second optimistic migration possibility to COBRA : today • Realistic migration to COBRA : Thursday, Friday • Aquarium • a) flushing gas (5 hours) + HV (last 3 hours of gas flushing) • b) measurement and analysis (2 hours ) • c) flush He in Aquarium (3 hours) • d) eventually measurement and analysis( 2 Hours) •  total of 12 Hours • Support • a) flushing gas (7 hours) + HV (last <3 hours of gas flushing) • b) measurement and analysis of previous run (3-6 hours  40000 events) • c) change connection and cosmic Scintillator position(1 hour) • Total of 11 hours for the first after Aquarium run, < 7 hours for the others ( without repair) DC status, 18.07.2007, je

  22. Finish testing on support • Transport and insert in COBRA • Measure geometry by survey group • Cabling in pE5 2 days • Test DAQ complete system • Cosmic without COBRA field (alignment) • Cosmic with COBRA field (when COBRA on) > 4 working days DC status, 18.07.2007, je

  23. End DC status, 18.07.2007, je

  24. photos DC status, 18.07.2007, je

  25. photos DC status, 18.07.2007, je

More Related