6 JULY 2011

6 JULY 2011. Overview of BATOBIC Projects. Construction of the Bulembu Road – R167 000 000 – Completed 2009 The Barberton Tourism and Biodiversity Corridor (BATOBIC) is a programme with the objective of developing sustainable nature based, adventure and cultural tourism within the region;

Télécharger la présentation

6 JULY 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6 JULY 2011

  2. Overview of BATOBIC Projects • Construction of the Bulembu Road – R167 000 000 – Completed 2009 • The Barberton Tourism and Biodiversity Corridor (BATOBIC) is a programme with the objective of developing sustainable nature based, adventure and cultural tourism within the region; • BATOBIC is responsible for coordinating the implementation of a number of projects, funded by the National Dept. of Tourism in aid of poverty relief. These include: • Institutional Strengthening of BATOBIC; • 3 TOURISM ROUTE PROJECTS • Tourist Route Development & Marketing; • Signposting & beautification of 2 main Umjindi access intersections; • Development of Bulembu Road Geotrail; • OTHER PROJECTS • Cultural Heritage town enhancement programme. • Development of 1st phase Bio Park & Visitor Info Centre; • Lomshiyo Trust Lodge Development; • Further projects & interventions identified from strategy

  3. 3 projects BARBERTON GATEWAYS GENESIS ROUTE MAKHONJWA GEOTRAIL

  4. Makhonjwa Geotrail • ROUTE EXTENT: • 20 Sites between Barberton & Bulembu: • 10x Geological Sites • 6 x view sites • 4 x geological & view sites • 13 require intensive development • 7 require only a signage plinth

  5. GEOSITES

  6. Barberton Gateways SHEBA ROAD GENERAAL STREET

  7. Branding

  8. GENESIS ROUTE ‘Z’ FOLDER

  9. GEOTRAIL ‘Z’ FOLDER

  10. Remaining challenges: