“Trains” Case Study

“Trains” Case Study. “Trains” - Architecture. Worldwide Facilities Management Single Giant Focal point IT Operations Center Control many individual systems operations Manned 24x7 Skilled Expertise 22 WorldView client workstations Single repository. Florida rep. Backup rep.

faunus
Télécharger la présentation

“Trains” Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Trains” Case Study

  2. “Trains” - Architecture • Worldwide Facilities Management • Single Giant Focal point IT Operations Center • Control many individual systems operations • Manned 24x7 • Skilled Expertise • 22 WorldView client workstations • Single repository

  3. Florida rep Backup rep Architecture - US Central Datacenter International IT resources

  4. Workload Environment • Central MVS Systems • Own the schedule and direct work on NT and Unix • NT Servers (about 30) • Unix servers (initially 30 growing to >100)

  5. ”Trains" - The Challenges • Aim 1: Provide focal point monitoring of all systems, network components, applications and databases • Aim 2: Provide the ability for complete management and control of Unix systems from NT • Aim 3: Provide focal point workload control from MVS of NT and Unix

  6. ”Trains" - Considerations • No Unix skills to be required at central • Full control of systems must shift between any desired NT client • Resilience of the solution between primary and backup DSM/repository systems • Scalability, the ability to dynamically add and remove NT servers and Unix systems without major rework.

  7. “Trains” Deployment • Primary and Backup TNG Repository at the Florida datacenter • DSMs deployed as required at remote Sites. Each DSM is connected to FL Rep • Enterprise Management as required on managed Servers. • Agent technology on Hosts/Servers managed by Site DSMs

  8. FL-Rep FL-Rep DSM DSM Domain Domain Server Level Deployment • Agents on Hosts/Servers • DSM/s manage domains according to scale • Enterprise Management deployed on servers as required Server Site

  9. “Trains” - The Solution • Aim 1:Provide management of whatever systems, network components, applications and databases the client requires... • WorldView Interfaces • Enterprise Management Disciplines • Agent Technology • Scaleable, Distributed Solution

  10. “Trains” - The Solution • Aim 2:Provide the ability for complete management and control of Unix systems from NT... • Unix Events may be managed and controlled from central NT locations • Agent Technology on end-systems • Distributed State Machines & WorldView instrument the enterprise

  11. “Trains” - The Solution • Aim 3: Provide focal point workload control from MVS of NT and Unix… • Workload Agents on NT and Unix can be driven from MVS (as well as NT and Unix) • MVS remote NT/Unix job status reported back to CA7 on MVS • All workload status available on NT workstation

  12. “Trains” - Future Enhancements • Expand to >100 Unix boxes • Implement USD/AMO