An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEGIATAN KONSULTAN MANAJEMEN PROYEK (KMP) REGIONAL 3 PALEMBANG TAHUN 2008 DAN TAHUN 2009

  2. KEGIATAN KONSULTAN MANAJEMEN PROYEK (KMP) REGIONAL 3 PALEMBANG TAHUN 2008 DAN TAHUN 2009 • KEGIATAN KMP REGIONAL 3 PALEMBANG Th. 2008 PERIODE : (MARET 2008 – 31 DESEMBER 2008) RESUME KEGIATAN KMP REGIONAL 3 PALEMBANG PERIODE : (MARET 2008 – DESEMBER 2008) (HANYA HARD COPY !!!) KEGIATANKMP REGIONAL 3 PALEMBANG Th. 2009 >> PERIODE : (JANUARI 2009 – JULI 2009) LAPORAN RAPAT-RAPAT DAN PRESENTASI BESERTA RESUME >> MEMBUAT RMK KMP REGIONAL 3 PALEMBANG >>

  3. DAFTAR PERSONIL KMP REGIONAL 3 PALEMBANG

  4. LAPORAN - LAPORAN

  5. EVALUASI, REKOMENDASI, KESIMPULAN DAN SARAN 2008 / 2009 EVALUASI PERMASALAHAN 2008 >> REKOMENDASI 2008 >> KESIMPULAN DAN SARAN 2009 >>

  6. PELAKSANAAN PERJALANAN DINAS Dalam Tabel Rekapitulasi Perjalanan Dinas Personil KMP Regional 3 Palembang yang telah terpakai, banyaknya Perjalanan Dinas tersebut dapat dilihat menurut keperluannya sesuai dengan Koordinasi bersama Project Officer KMP Reginal 3 Palembang, adalah sebagai berikut : a. Mengikuti PCM dan Monitoring Paket pekerjaan Jalan Provinsi Jambi b. Monitoring kondisi jalan di Jl. Lintas Timur dan Lintas Tengah Provinsi Sumatera Selatan c. Pemeriksaan AMP yang menggunakan Bahan Bakar Batubara di Provinsi Jambi, Sumsel dan Babel d. Monitoring jalur lebaran tahun 2008 Lintim dan Lintas tengah Provinsi Jambi dan Sumsel e. Menghadiri rapat koordinasi bersama KMP Regional 1,2, KMP Pusat dan KMP Regional 5 di Jakarta f. Presentasi Filler, rapat koordinasi dan pengambilan data di Provinsi Babel

  7. LAYANAN MEMBANTU BALAI DALAM PEMERIKSAAN • Konsultan Manajemen Proyek (KMP) Regional 3 Palembang dilibatkan untuk memonitor dan mengevaluasi didalam pemeriksaaan Laporan Bulanan Field Team, FHO, Jalan Longsor / Kritis. • Menyiapkan Peta Jalur Lebaran Tahun 2009 M/1430 H.

  8. GUNA MEMBANTU PROJECT OFFICER DALAM MEMBERIKAN ARAHAN KEPADA PPK DI MASING – MASING PAKET, KMP REGIONAL III PALEMBANG MELAKSANAKAN BERBAGAI AKTIVITAS ANTARA LAIN : - Memeriksa persiapan data/gambar yang perlu, pada pelaksanaan Jembatan Liam Kecil di Provinsi Jambi. - Memeriksa dan menghitung kembali volume Abutmen dan Plat Lantai Jembatan Liam Kecil di Provinsi Jambi. - Berkoordinasi dengan Quality Engineer Konsultan Supervisi/Kontraktor untuk pembuatan JMF - Monitoring dan Evaluasi hasil DMF/JMF Hot Mix, Aspal Buton, Aggregat Klas A/B di Provinsi Jambi, Sumsel dan Babel. - Mengevaluasi penggunaan Aspal Beton (AC-WC, AC-BC dan AC-Base) pada campuran panas

  9. MENGIKUTI KEGIATAN-KEGIATAN DI BBPJN III • Sosialisasi Sistem Manajemen Mutu (SMM). • Work Shop/Lokakarya KMP Pusat. • Work Shop/Pelatihan Pengelolaan Lingkungan Hidup Bidang Jalan. • Diseminasi Road Safety Engineering yang dilaks. di BBPJN III. • Rapat-rapat dan Presentasi yang diadakan BBPJN III, P2JJ Sumsel dan KMP Regional III Palembang. • Diseminasi NSPM Bidang Jalan Perencanaan dan Pengawasan. • Pelatihan Standar Bidding Bokumen ADB di Palembang • Presentasi jalur lebaran oleh KMP 3 >> • Presentasi dan Sosialisasi KMP di Jambi, Sumsel dan Babel melalui Buletin Balai 2009 • Presentasi Filler oleh KMP di BBPJN III (Tahun 2008) • Mengikuti Presentasi untuk Pelaksanaan Pekerjaan Daur Ulang : - Penggarukan Lapisan Aspal Lama - Lapis Cement Treated Recycle Base (CTRB) - Lapis Cement Treated Recycle Sub-Base (CTRSB) - Lapis Cement Mix Recycle Foam Bitumen (CMRFB–Base)

  10. Kegiatan KMP Regional 3 Palembang di Tahun 2009 • Laporan Bulanan dan Laporan Khusus dan Laporan Rapat-Rapat / Presentasi. • Notulis Rakor Semester I Tahun 2009 BBPJN III. • Kunjungan Lapangan : Monitoring Pelaksanaan, Survey Kondisi Jalan, Jembatan, dll. • Dokumentasi Percobaan Asbuton Butir di Gelumbang. • Mengadakan Pengukuran dan Validasi data IRMS bersama Kombinasi Team antara Seksi Perencanaan BBPJN III, P2JJ Sumsel, CT-P2JJ Sumsel dan RPMC untuk jalan Lintas Timur (Sumatera Selatan) arah Jambi dan arah Bts. Lampung.

  11. Dokumentasi Proyek • Jambi >> • Sumatera Selatan >> • Kepulauan Bangka Belitung (2008) >>

  12. Sekian Terima Kasih