1 / 25

Community-Driven Project Development

KC NCDDP Roll-Out Pre-Deployment Training for ACTs. Community-Driven Project Development. Hotel del Rio, Iloilo City September 22, 2014. PROJECT DEVELOPMENT. Kalahi CIDSS Objective R educe Poverty I mprove Local Governance E mpower Communities. PROJECT DEVELOPMENT.

fiona-cash
Télécharger la présentation

Community-Driven Project Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KC NCDDP Roll-Out Pre-Deployment Training for ACTs Community-Driven Project Development Hotel del Rio, Iloilo City September 22, 2014

  2. PROJECT DEVELOPMENT Kalahi CIDSS Objective • Reduce Poverty • Improve Local Governance • Empower Communities

  3. PROJECT DEVELOPMENT SUB-PROJECT CATEGORY AND SUB-PROJECT TYPE What can be funded by KC-NCDDP? SUB-PROJECT CATEGORY SUB-PROJECT TYPE 1. Basic Social Services a. Water System (Level 1 and II) b. Elementary School Building c. High School Building d. Day Care Center e. Health Station f. Electrification (on-grid, off- grid and renewable energy) g. Tribal Housing/Shelter 2. Basic Access Infrastructure a. Barangay Road b. Foot/Small Bridges/ Spillway/Overflow c. Access/Footpath (Tirepath, pathwalk, foot trail)

  4. SUB-PROJECT CATEGORY SUB-PROJECT TYPE 3. Community Production & a. Community Enterprise Economic Support b. Pre/Post Harvest Facility c. Small Scale Irrigation d. Multi-use Bldg./Facility 4. Environmental Protection a. Drainage System and Conservation b. River/Flood Control c. Seawall d. Soil/Slope protection e. Environment Conservation f. Sanitation and Solid Waste Management 5. Skills Training and Capability Building

  5. PROJECT DEVELOPMENT What can be funded by KC-NCDDP other than regular SPs? • Repair of rural and local roads, and Repair/reconstruction of small bridges (maximum span of up to 15m). • Backfill, reshaping and landscaping of areas affected by erosion • Repair of existing riverbank protection systems and earth-fill dykes up to 5m height if supervised by a qualified engineer. 

  6. PROJECT DEVELOPMENT What can be funded by KC-NCDDP? • Construction of temporary bypass roads up to 500 m length, if not located in sensitive habitats and land acquisition is needed and bypasses are completely removed and the alignment restored to its original conditions once the need for their service has expired. • Repair / reconstruction of communal irrigation and water supply systems and of facilities that they have been completed with project funding.

  7. PROJECT DEVELOPMENT What can be funded by KC-NCDDP? • Collection and removal of technogenic debris (building parts and mixed waste from public infrastructure), timber such as uprooted trees and plant debris from public spaces and agricultural areas, and its deposition in pre-existing waste management facilities that are operating under national licensing and regulations and compliant with normal practices in the country. • Repair of public buildings (including barangay halls, schoolbuildings, daycare centers, government offices, tribal halls, meeting hall, multi-purpose centers and places of congregation used as administrative spaces for disaster and relief operations and information dissemination) and infrastructure (e.g. transmission lines, street lighting, traffic signs, bus stops).

  8. PROJECT DEVELOPMENT What can be funded by KC-NCDDP? • The procurement tools and equipment for purposes of removal of debris (i.e. chain saws and/or bolt/wire cutters), provided that the purchase is approved by, and the tools are subsequently registered with the appropriate regulatory agencies. • Shelter, including emergency and transitional shelter and temporary housing, and support for permanent shelter repair in safe areas. • Setting up of temporary facilities to deliver basic service needs of affected communities, such as field schools, temporary health facilities, and water facilities.

  9. PROJECT DEVELOPMENT What can be funded by KC-NCDDP? • The procurement tools and equipment for purposes of removal of debris (i.e. chain saws and/or bolt/wire cutters), provided that the purchase is approved by, and the tools are subsequently registered with the appropriate regulatory agencies. • Shelter, including emergency and transitional shelter and temporary housing, and support for permanent shelter repair in safe areas. • Setting up of temporary facilities to deliver basic service needs of affected communities, such as field schools, temporary health facilities, and water facilities.

  10. PROJECT DEVELOPMENT What is Project Development? In the context of KALAHI CIDSS, project development is the process of determining and designing the most appropriate and responsive solution (or set of solutions) to community problems and development challenges. This process proceeds through the Project Development Cycle.

  11. PROJECT DEVELOPMENT What is Project Development Cycle? The project development cycle outlines four critical areas that need to be considered in developing a community project. These areas cover following: a. Project Identification and Selection b. Project Development c. Project Implementation and Management d. Project Sustainability

  12. PROJECT DEVELOPMENT What is Project Development Workshop? Is a major activity in the empowerment activity cycle which seriously considers the following: • selection of appropriate interventions; • discussions on the possible effects/impact of the proposed technologies/designs for implementation; • evaluation of the capacity of community members to implement sub-projects;

  13. PROJECT DEVELOPMENT What are the features of community-driven PDW? • A suitable planning methodology that ensures the participation of community members, which will in turn, ensure the success of implementation. • In the PDW, community members “learn by doing”, a process which will provide them with adequate knowledge and skills in the development of proposals

  14. PROJECT DEVELOPMENT What are the factors to consider in Project Development. • Selection of appropriate technology (or appropriate design) • Preparation of Feasibility Study • Undertaking simple economic analysis • Determining resource requirements and sources, and undertaking resource mobilization • Social and Environmental Safeguards

  15. PROJECT DEVELOPMENT What are the sequence of project development? • Selection of appropriate Technology and Design • Pre-Engineering • Social and Environmental Feasibility • Technical Feasibility (tariff setting with data from engineering design and O & M program) • Resource Requirements and Mobilization • Proposal Preparation

  16. PROJECT DEVELOPMENT What to determine for appropriate technology and design? • type of user - the planners have to consider the type of users (e.g. women, children, persons with disability) to be more socially responsive. • local resources available - Available standard design may not apply on difficult areas where local resources (materials) are available. This may have big effect on sub-project cost (cost effective SPs)

  17. PROJECT DEVELOPMENT What to determine for appropriate technology and design? • Geographical location- this involves identifying a wide range of applicable options based on the geographical location and the socio-cultural orientation of the community. • Cost Effectiveness– cost against benefits gained by a certain number of beneficiary and easy to operate and maintain by the end user.

  18. PROJECT DEVELOPMENT What to consider for appropriate technology and design? • Buildings Standard Design Alternative Design

  19. PROJECT DEVELOPMENT What to consider for appropriate technology and design? • Water System Level I Level II

  20. PROJECT DEVELOPMENT What to consider for appropriate technology and design? • Access Infra

  21. PROJECT DEVELOPMENT What do you observe on the picture?

  22. PROJECT DEVELOPMENT Evidence of under predicted flood magnitude.

  23. PROJECT DEVELOPMENT What do we do during Pre-engineering Works? • Site Validation • Surveying (Traverse, Profile, Cross section, Topographic) • Structural, Seismic and Hydraulic Analysis • Engineering drawings • Detailed Estimates • Program of Works

  24. PROJECT DEVELOPMENT What do we secure do ensure compliance to Environmental and Social Safeguards? • Lot Acquisition – DOD, Quitclaim, Certifications/Resolutions from concerned agencies (DENR, DAR, etc.). delaying the process is not an option • Permits and Licenses • Environmental Permits – ECC, CNC, EMMP. • Water Permits – NWRB, potability, etc. • Building Permits – Electrical, Sanitary, etc. • Zoning Clearances

  25. PROJECT DEVELOPMENT What do we secure do ensure compliance to Environmental and Social Safeguards? • Safety and Health Program • Compliance to Project’s Documentary Requirements • Risk Assessment and Analysis • Environmental and Social Safeguards Checklist/Investigation • Site Validation Report • Quality Control Plan • Employment Record Sheet • Operation and Maintenance

More Related