110 likes | 226 Vues
CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007. Berth LOA ─ 1,300 ft. PIER 94 / 96. Avg. Annual Dredge Costs. $135k (East) 5 -10,000 cu.yds. PIER 80. Avg. Annual Dredge Costs. Berth LOA ─ 1,138 ft. $500 k (All berths + Approach) 110 - 125,000 cu.yds.
E N D
CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007
Berth LOA ─ 1,300 ft. PIER 94 / 96 Avg. Annual Dredge Costs $135k (East) 5 -10,000 cu.yds
PIER 80 Avg. Annual Dredge Costs Berth LOA ─ 1,138 ft. $500 k (All berths + Approach) 110 - 125,000 cu.yds Berth LOA ─ 1,296 ft. Berth LOA ─ 2,317 ft.
PIER 70 Avg. Annual Dredge Costs - Unknown - Berth LOA ─ 1,300 ft.
Berth LOA ─ 1,000 ft. Berth LOA ─ 1,300 ft. PIER 50 Avg. Annual Dredge Costs $0 k ─ (East) $? k ─ (South)
Ber th LOA ─ 623 ft. PIERS 30 / 32 Avg. Annual Dredge Costs $0 (East)
PIER 27 Avg. Annual Dredge Costs $750k ─ (East) 30 – 40,000 cu.yds Ber th LOA ─ 1,358 ft.
PIER 35 Berth LOA ─ 807 ft. Berth LOA ─ 1,055 ft. Avg. Annual Dredge Costs $870k ─ (East) $480k ─ (West) 50-65,000 cu.yds