An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GÉANT2 update - II Otto Kreiter, DANTE

  2. E2E monitoring • UP/DOWN status monitored across domains for p2p circuits • 15 domains have deployed the MPs (measurement points) • Visualization tool developed by GN2-JRA4 • actively used by the E2ECU and NRENs • Encouraging the different domains to include sub-wavelengths info in their MP/MA (ie. GE connections) Sandbox: http://cnmdev.lrz-muenchen.de/e2e/lhc/

  3. E2ECU E2ECU DOES :- • Monitor End-to-End circuit • Send alerts about outages & maintenance • Manage information flow between domains E2ECU receives fault alerts from :- • End-to-End Monitoring System • NOCs by email These entities can send tickets to E2ECU :- • Campus Network Administrators • NREN NOCs • GEANT2 NOC Tickets sent out to parties involved in a particular project, except e.g. research scientists themselves.

  4. perfSONAR - MDM • Service desk to support the Multi Domain Monitoring service • Support perfSONAR products developed by GN2-JRA-1 • IP performance measurements • Pilot phase of the service being set up by JRA1 and SA3 GN2 activities for 5 NRENs • DANTE Operations collaborating in setting up the service desk • Looking for projects interested in the future to have the MDM service implemented

  5. Monitoring summary • E2ECU fully serving the p2p community of LHC & IGTMD • Deisa on his way • Ready to uptake other projects – EXPRES • Involved domains should install the required MP and MAs or • Should list the GE p2p links as well (currently mostly wavelengths are shown) • EXPRES may be interested in the MDM service

  6. Procurement update • Connectivity procurement on-going • Tenders “will be” for dark fibre if feasible, else 10Gb/s or 2.5Gbps wavelengths. • Key issues are connectivity to existing network and resiliency • Router hardware procurement • In the final phase – tender answers back 21st September • Looking for hardware to replace old equipment! • Key issue: a packet network for the future!