An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEAMTWO Team Staff Members: 吴 迪 密其宝 周大凯 闫红宝 李 涛 李立欣 胡德海 李艳芝

  2. Problem List-1 • Lack of mineral resources • Difficulty of develop mineral • Hard-controlled flooding • Poor surface soil • Difficulty of fertilizing soil • Incomplete irrigation systems • Non-diversified economic crops • Excessive expansion of agricultural lands

  3. Problem List-2 • Excessive deforestation • Grassland degeneration • Poor use of rainfall • Serious soil erosion • Disturbed balance of water • Increasing waste of land • Lack of cultivable land

  4. Single of economic crop Increasing waste land Difficult to improve soil Difficult of develop Livestock raising Abandoned settlement Poorly surface soil Grassland degeneration Serious soil erosion Excessive deforestation Disturbed balance of Water Hard-control flooding poor use of rainfall Excessive expansion agricultural land Incomplete irrigation systems Lack of cultivable land

  5. Problem Tree 1.diversification of economic crop 2.decreased waste land 4. Improvement of soil 3.Decreaseing of Livestock raising 5.Reasonable planning settlement 7.Upgrading of surface soil 6.Prevented grassland degeneration 8.Prevented soil erosion 9.Decreased deforestation 10.Improved water distribution 11.efficacious control flooding 12.full use of rainfall 13.retarded expansion agricultural land 14completed irrigation systems 15.Full use of cultivable land

  6. Project Design 1.Grouping: Group A=objective 1,3,4,6,7 and 8 Group B=objective 10, 11, 12,and 14 Group C=objective 2,5,9,13 and 15 2. Project Planning Project A (Group A): Up-grading soil project Project B (Group B): Reasonable use of water resources project Project C (Group C): Reasonable use of land project

  7. Project Priority Matrix

  8. Objectives tree 1.diversification (3K)of economic crop 2.decreased40% waste land 4. Improvement 50% of soil 3.Decreaseing30% of Livestock raising 5.Reasonable50% planning settlement 7.Upgrading50% of surface soil 6.Prevented 20%grassland degeneration 8.Prevented 10%soil erosion 9.Decreased60% deforestation 10.Improved60%water distribution 11.efficacious control 20%flooding 12.full use of30% rainfall 13.retarded expansion 20%agricultural land 14completed 60%irrigation systems 15.Full use of80% cultivable land

  9. WBS

  10. coding tasks time(month) 1 Prevented 10% soil Erosion in 5 tears 44 1.1 Increase 15% green areas 25 1.11 Stop 80%deforestation 2 1.111 Formulate regulations 1 1.112 Supervision 1 1.12 Planting trees50% 7 1.121 Purchase suitable local species 1 1.122 Household contract 6 1.13 Increase 20%grassland 25 1.131 Purchase suitable Local grass species 1 1.132 Reasonable develop Livestock raising 24 1.2 Reasonable control30%agricultural land 1.21 completed 60%irrigation systems 6 1.211 Reservoir expansion 36 1.212 Construct drains 24 1.22 diversification (3k)of Economic crop 36 1.221 Purchase suitable Local species 1 1.3 Reasonable planning20% Settlement 24 1.31 decreased 5%waste land 6 WBS DICTIONARY

  11. 网络图 0 1 1 2 1.111 1.112 0 1 1 7 1.121 1.122 1 25 0 1 1.131 1.132 0 0 0 38 44 44 start 1.211 End 1.000 38 44 1.21 0 24 1.212 1 37 0 1 1.221 1.22 0 6 6 30 单位:月 1.31 1.3

  12. Marketing

  13. Task Imple- Monitor Time Cost($ Quality Pre-Task Parallel-Task Post-Task Changing menter 10,000) Criteria 1.1 a ndy m i 25 1 .1,1.2,1.3 1.2 ------ Criteria 1.11 s teven l an 2 1 .112,1.122,1.132 1 .12,1.13 1.1 Criteria 1.111 j acky q iu 1 ------ 1 .112,1.121,1.131,1.211,1.212,1.221,1.31 1.112 Criteria 1.112 t ina p eter 1 1.111 1 .122,1.132,1.21,1.22,1.3 1.112 Criteria 1.12 l ucy j iang 7 1.121 1 .13,1.11 1.1 Criteria 1.121 jack s ong 1 ------ 1 .112,1.111,1.131,1.211,1.212,1.221,1.31 1.122 Criteria 1.122 j hon h u 6 1.121 1 .122,1.132,1.21,1.22,1.3 1.1 Reasons Criteria 1.13 c harles q ian 25 1.31 1 .11,1.12 1.1 , Appling, Criteria 1.131 z hang j ing 1 ------ 1 .112,1.121,1.111,1.211,1.212,1.221,1.31 1.3 Approved, Criteria Recording 1.132 w ang y u 24 1.131 1 .122,1.132,1.21,1.22,1.3 1.132 Criteria 1.2 w u s hi 44 1 .21,1.22 1.1 1.1 Criteria 1.21 y an t ang 6 1 .211,1.212 1 .122,1.132,1.21,1.22,1.3 1 Criteria 1.211 z hou x ue 38 ------ 1 .112,1.121,1.131,1.111,1.212,1.221,1.31 1.21 Criteria 1.212 l i p an 24 ------ 1 .112,1.121,1.131,1.211,1.111,1.221,1.31 1.21 Criteria 1.22 z hao m eng 36 1.221 1 .122,1.132,1.21,1.22,1.3 1.2 Criteria 1.221 c hen k ong 1 ------ 1 .112,1.121,1.131,1.211,1.212,1.111,1.31 1.22 Criteria 1.3 l iu m o 24 1.31 1 .122,1.132,1.21,1.22,1.3 1 Criteria 1.31 t ian n ing 6 ------ 1 .112,1.121,1.131,1.211,1.212,1.221,1.111 1.3 Project Plan Matrix 66 88 68 44 20 8 77 22 66 56 5 3 32 11 23 33 23 12

  14. Project Manager job responsibilities • the project manager is the legal representative of Construction Enterprises agent of the enterprises responsible for the overall project • the state and local governments to comply with the policies, laws and regulations, the implementation of relevant rules and regulations and higher-level directives on behalf of enterprise performance and the owners of the project contracts signed.

  15. DMA

  16. Thanks for you attention!