SlideServe
Menu
Préférences
© SlideServe · v2026

Future Circular Collider ARUP: Status of Geological Models Yung Loo Andy Kervell

fred avatar
21 diapositives · 514 Views · Jul 20, 2014

Future Circular Collider ARUP: Status of Geological Models Yung Loo Andy Kervell. Contents. Scope of Work and Work Stages Preliminary Geological Studies and Decision Aid Tool Preliminary findings and constraints Geological Studies – Next Stages Decision Aid Tool (GIS) – Next Stages

Future Circular Collider ARUP: Status of Geological Models Yung Loo Andy Kervell - slide 1
01 / 21Future Circular Collider ARUP: Status of Geological Models Yung Loo Andy Kervell
1 / 17

Télécharger la présentation

Future Circular Collider ARUP: Status of Geological Models Yung Loo Andy Kervell
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Future Circular ColliderARUP: Status of Geological ModelsYung LooAndy Kervell

  2. Contents • Scope of Work and Work Stages • Preliminary Geological Studies and Decision Aid Tool • Preliminary findings and constraints • Geological Studies – Next Stages • Decision Aid Tool (GIS) – Next Stages • Proof of Concepts and Project examples • Discussion on requirements, constraints, opportunities to collaborate. • Next steps (+ furthered in afternoon session)

  3. Work Stages

  4. Preliminary Geological Studies | Decision Aid Tool • A. Key Variables: • Tunnel Elevation • Tunnel Gradient & Inflection Point • Shaft Position on Ring • B. Key Outputs: • Summary statistics: • Shaft depth +uncertainty • C. Accessible Interface

  5. Preliminary Geological Studies | Decision Aid Tool • 0km to 10km • Molasse / Moraine interface drops steeply to the north of Latitude ~46.27 (~North of Corsier) • To avoid tunnelling through the moraine under Lake Geneva, the ring needs to pass: • South of Latitude ~46.27 • Below ~250mASL. • Tunnel through moraine? Lake sediment rockhead? • EPBM? / Slurry TBM? / Immersed Tube (IMT)? [seismic survey carried out by Fiore (2011)]

  6. Preliminary Geological Studies | Decision Aid Tool • 10km to 45km • Tunnel enters pre-alpine thrust front • Transition from Geneva Basin Molasse to overthrustedpre-alpine molasse and flysch • Subsurface contact is not expected to be clearly defined. • Faulting and Cretaceous basement extent to be determined • Tunnel engineering geology broadly similar across molasse sequences • La rivière de l’Arve at Chainage 25km will be underlain by moraine. It is not expected to clash with a graded alignment.

  7. Preliminary Geological Studies | Decision Aid Tool • 45km to 75km • Tunnel intersects foothills of Southern Saleveand foothills of Vuache, bordering the molasse • Two main molasse sections underlie Les Usses and La Rhone. (peak of a graded alignment) • Connectivity with rivers, underground solution features, uncompactedsuperficials • Definition of rockhead level important here

  8. Preliminary Geological Studies | Decision Aid Tool • 75km to 100km • Tunnel contacts between the foothills of the Jura and the MolasseBasin. • Tunnelling through sedimentary sequences may be unavoidable, unless whole alignment moved SE. • Better definition of rockhead contact needed.

  9. Preliminary Geological Studies | Decision Aid Tool • Summary: Areas to Focus • Moraine/molasse boundary beneath Les Usses and La Rhone • Jura limestone/molasse boundary at the Northwest part of the ring • Lateral extent of subsurface limestone/sedimentary sequences at the Southern Saleve and Vuache • Further geological investigation, particularly of the sub-alpine molasse/flysch to cover: Effects of faulting, other geohazards and engineering geological features specific to the various sequences.

  10. Geological Studies – Next Stages St-Claude Douvaine St-Julien-en Genevois Annemasse Annecy Bonneville Seyssel

  11. Geological Studies – Next Stages e.g. Annemasse: Mapped Molasse-Quaternary Contact Annecy-Bonneville: Mapped cross-section on Saleve BRGM: Carte Geologique de la France a 1/50 000, no. 654 BRGM: Carte Geologique de la France a 1/50 000, no. 678

  12. Next Stages Constraints • Geometric • Circumferencial variation • Ring shape e.g. quasi-circular, quasi-racetrack • Planarity • No. of shafts and spacing • Geological • Rockhead contacts: Quaternary | Molasse | Cretaceous • Geohazards: Faults, expansive soils, aquifers, stress, caves

  13. Decision Aid Tool (GIS) – Next Stages Geometric Attributes Geotechnical Attributes Shieldhall Tunnel CERN: 80km Ring Concept Combined Attributes + Outputs ArcGIS Platform Gaming Engine Based Geological Models

  14. Decision Aid Tool (GIS) – Next Stages Preliminary Proof of Concept http://glogis04/cern/index.php

  15. Decision Aid Tool (GIS) – Next Stages

  16. Available Data • http://infoterre.brgm.fr/viewerlite/MainTileForward.do • http://geoservices.brgm.fr/wms-c.html • Existing Investigations: • Annemasse – Isohypses du contact Molasse/Quaternaire • 1960s – Humilly-1/2 (St-Julien-de-Genevois), Faucigny-1 – Petroleum Exploration • Thônex – 1993 – geothermal investigation • Peissy-1 – Hydrocarbon wells • 7BHs – BP-France (Canton Geneva) • Mount Sion Motorway Tunnel – A41 • Lake Geneva Tunnel • UNIL: Applied Geology Research • CERN: LHC, VLHC (GADZ)

  17. BRGM – French Geological Reference Platform • French Geological Reference Platform (http://www.brgm.eu/content/french-geological-reference-platform) • “Acquisition and management of geological data that involves the entire French geosciences community (university laboratories, companies, etc.) • 1/50 000 + subsoils databank (BSS) • Geological and geophysical surveys planned • Multi-annual programme that will be deployed in stages across France through regional work programmes”

  18. BRGM – French Geological Reference Platform

  19. Next Steps • Requirements & Granularity • Priorities & Critical Areas • Responsibilities & Collaborations • Opportunities PHYSICS GEOLOGY ENGINEERING GIS