1 / 3

TOF Tray Installation Guidelines & Cooling System Upgrade

Learn how to properly install TOF trays behind TPC support arms, with emphasis on TPC support at 6 o’clock. Discover the concept of TOF tray cooling using MCW and the recent addition of an 80-ton chiller for efficient cooling of electronics racks and trays. Water distribution from BEMC SMD’s utilized.

frieda
Télécharger la présentation

TOF Tray Installation Guidelines & Cooling System Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Installing TOF Trays behind TPC Support Arms Requires support of TPC at 6 o’clock Removal of TPC east support arms

  2. TPC 6 o’clock Support Concept

  3. TOF Tray cooling using MCW Recent upgrade of STAR MCW added stand alone 80-ton chiller This included for TOF 35 kW electronics racks and 30 kW trays Will use the same water distribution system as for BEMC SMD’s

More Related