1 / 7

Equipment Opening Testing Criteria

Equipment Opening Testing Criteria. Phillips 66 High Learning Value Event. Testing Criteria. 50% LEL 50ppm H 2 S 500ppm VOC * < 150 F < 1psi Pressure No Residual Liquid; periodic drips only No guarantee of safety. PPE often Needed. When Is Testing Done?. Initial Equipment Opening

gad
Télécharger la présentation

Equipment Opening Testing Criteria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Equipment Opening Testing Criteria Phillips 66 High Learning Value Event

  2. Testing Criteria • 50% LEL • 50ppm H2S • 500ppm VOC * • < 150 F • < 1psi Pressure • No Residual Liquid; periodic drips only No guarantee of safety. PPE often Needed.

  3. When Is Testing Done? Initial Equipment Opening • All initial openings on process equipment prior to line or flange breaking. • Sub-systems receive independent tests. • Steam & hydrocarbon Re-Testing • Whenever equipment is completely closed it will be re-tested prior to opening. • Blinded vessels may be left open. • Valve isolations are always closed ea. shift.

  4. How is Testing Conducted Operator Testing • 5-Gas Meters • LEL, H2S, VOC • Dilution Fitting 5:1 • Temperature Gun • Try Point Bleeds, Vents * Pressure gauges are an indicator; but not measure.

  5. Craftsperson Verification Try Point Tag • Minimally, every shift each Lead Craftsperson* is required to verify absence of energy and Equipment Opening Testing Criteria prior to working on a piece of equipment. * Must be on the tools. • Craft verifies & signs tag during Initial Opening • Individual workers may always personally verify energy control.

  6. Criteria Not Met/Unable to Test? Criteria Not Met Unable to Test No Try Point, Bleed or location to test. Option 1 – Redesign Equipment Isolation Option 2 – Job Safety Plan JSP does not guarantee work will proceed. • LEL, H2S, VOC too high? • Temperature too high? • Residual Liquid/Pressure? Option 1 – RE-Clean Equipment Option 2 – Alternate Plan Option 3 – Job Safety Plan* * OPS/MAINT/H&S Supv’s

  7. Conclusion • All equipment that contains process fluids must be tested for hazards prior to initial line breaking: • LEL, H2S, VOCs, Temperature, Pressure & Residual Liquid • Readings are recorded on the Try Point Tag which is attached to the bleed on the equipment. • Crafts persons must verify acceptable readings prior to performing any initial line breaking activities. • Further equipment cleaning or redesigning the task is the preferred solution to non-passing criteria. • Job Safety Plan is required for any deviations to criteria.

More Related