This presentation outlines the development and testing processes for an optical transceiver project across 12 weeks. Key activities include budget analysis, schematic design, PCB layout, and extensive testing phases focusing on alignment tolerance and shielding efficiency. The project involves a collaborative effort among team members, with tasks divided into management, design, assembly, and testing phases, addressing both conservative and aggressive design approaches. Results from the various testing stages provide insight into the product's performance and adherence to specifications.
E N D
GROUP 1 FINAL PRESENTATION Ragad Al-Huq Michael Fabery Mustansir Pratapgarhwala Yeonshin Won Dae-Geun Yoon
Week 1 Task Management • Webmaster - Michael, Mustansir • Budget Analysis and Ordering - Yeonshin • Testing - Michael, Mustansir, Yoon • Design – Michael, Mustansir, Ragad • Building/Soldering – Yoon • Alignment Tolerance & Analyisis – Mustansir, Yoon
Week 2 Test Receiver Board Results D 21.5 K 28.5 PRBS7 K 28.7
Transceiver Boards Standard Design Aggressive Design
Week 8 – Receiver Testing Receiver Conservative PRBS7 Receiver Aggressive PRBS7 Conservative/Aggressive Receiver 5 dB
Week 9 – Tx Testing Conservative TX 0 dB Conservative Tx 5 dB Aggressive Tx 0 dB Aggressive Tx 5 dB PRBS7
Week 10 Loopback Testing Aggressive Design Conservative PRBS7 0 dB Aggressive PRBS7 0 dB Aggressive D21.5 5 dB
Week 10 – Alignment Tolerance Bad Results D21.5 0 dB PRBS7 0 dB K28.5 0 dB
Week 11 – Alignment Tolerance Good Results Rx 0 dB D21.5 Rx 0 dB K28.5 Rx 0 dB PRBS7
Week 12 – Shielding 1 of 3 K28.5 Before Shielding 5 dB PRBS7 Before Shielding 5 dB K28.5 After Shielding 5 dB PRBS7 After Shielding 5 dB
Week 12 – Shielding 2 of 3 K28.5 Before Shielding 10 dB PRBS7 Before Shielding 10 dB K28.5 After Shielding 10 dB PRBS7 After Shielding 10 dB
Week 12 – Shielding 3 of 3 K28.5 Before Shielding 15 dB PRBS7 Before Shielding 15 dB K28.5 After Shielding 15 dB PRBS7 After Shielding 15 dB
How Much? Quantities of 1000