An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LTTIWG MeetingApril 22, 2009 ISTEP Phase 2:South Louisiana Bulk Study

  2. Wilbert-Champagne-Wells (WCW) • The Wilbert-Champagne-Wells Option (WCW) is the construction of a new 230 kV line from Wilbert to Champagne to Wells at an estimated cost of $142.1 million. The Acadiana Improvement Project costs are an estimated $200 million. Underlying upgrades to support a transfer of at least 250 MW out of Southeast Louisiana to either WOTAB or Southern Company would include: • Rayburn-Jasper • Mossville-Nelson • Tezcuco-Waterford • Cajun-Wilbert • at an estimated cost of $57.8 million, bringing the total costs to $400 million. With this set of upgrades, it is estimated that approximately 251 MW of transfer capability would be created between Southeast Louisiana area and either WOTAB or Southern Company. The estimated congestion cost savings is $230 million annually, with a simple payback period of 1.74 years.

  3. Wilbert-Champagne-Wells (WCW) Sellers Road Segura

  4. Audubon-Richard (AR) • The Audubon-Richard Option (AR) is the construction of a new 230 kV line from Audubon to Richard at an estimated cost of $154.4 million. The Acadiana Improvement Project costs are an estimated $200 million. Underlying upgrades to support a transfer of at least 250 MW out of Southeast Louisiana to either WOTAB or Southern Company would include: • Rayburn-Jasper • Mossville-Nelson • Tezcuco-Waterford • at an estimated cost of $28.4 million, bringing the total costs to $382.8 million. With this set of upgrades, it is estimated that approximately 291 MW of transfer capability would be created between Southeast Louisiana area and either WOTAB or Southern Company. The estimated congestion cost savings is $232.3 million annually, with a simple payback period of 1.65 years.

  5. Audubon-Richard (AR) Audubon Sellers Road Segura

  6. Wilbert-Moril (WM) • The Wilbert-Moril Option (WM) is the construction of a new 230 kV line from Wilbert to Moril at an estimated cost of $124.5 million. The Acadiana Improvement Project costs are an estimated $200 million. Underlying upgrades to support a transfer of at least 250 MW out of Southeast Louisiana to either WOTAB or Southern Company would include: • Rayburn-Jasper • Mossville-Nelson • Tezcuco-Waterford • at an estimated cost of $28.4 million, bringing the total costs to $352.9 million. With this set of upgrades, it is estimated that approximately 275 MW of transfer capability would be created between Southeast Louisiana area and either WOTAB or Southern Company. The estimated congestion cost savings is $234.7 million annually, with a simple payback period of 1.5 years.

  7. Wilbert-Moril (WM) Sellers Road Segura

  8. Underlying Support Upgrades