An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

  2. Topics Control of Asbestos Regulations 2012 RIDDOR Fee for Intervention Refurb’ Campaign – Feb/March 2012 Work plan 2012/13

  3. Control of Asbestos Regulations 2012 • EU Directive on exposure to asbestos (Directive 2009/148/EC) • 6th April 2012 • What has stayed the same • What has changed • Notification • April 2015 – health surveillance • Enforcement expectation

  4. RIDDOR • 6th April • The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened). • The deadline by which the over-seven-day injury must be reported has also increased to 15 days from the day of the day of the accident.

  5. Fee For Intervention • Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion. • £124 per hour * • October 2012 ?

  6. Refurbishment campaign Inspection initiative 20th Feb to 16th March -Refurb’ & small sites No of sites visited – 132 (3237) No of Contractors seen – 175 (4080) No of notices issued – 27 (581) FFI dry run Issues -WAH, Fire Safety, Good Order, asbestos survey

  7. Work plan 2012/13 • Priority Areas • Asbestos • Small sites • Refurbishment • Major Projects • Timber Frame buildings • Temporary Demountable Structures