An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Situation of ATM in Europe Background Institutional set-up SES-Implementation and SESAME Contents of Presentation

  2. Situation of ATM in Europe European airspace is fragmented according to national borders rather than traffic flows. More than 60 Area Control Centres in Europe in 2003.

  3. Situation of ATM in Europe Sectors and routes are designed according to national borders rather than traffic flows.

  4. Situation of ATM in Europe Traffic is still expected to grow, and even to double between 1997 and 2020.

  5. Situation of ATM in Europe Congestion leads to sub optimal trajectories.

  6. Situation of ATM in Europe The busiest routes have to avoid military areas.

  7. Situation of ATM in Europe Military areas are located in the core area of Europe.

  8. Background • The European Commission, Vice President Ms de Palacio, launched the initiative in 1999. • Main principles: • Reduce fragmentation between: • the airspace of Member States, • civil and military providers and users, • systems • Introduce new technology • Create synergy EU – Eurocontrol

  9. Background 20 April 2004: Entry into forceof 4 Regulations of the European Parliament and the Council: • No 549/2004:Framework • No 550/2004:Service Provision • No 551/2004:Airspace • No 552/2004:Interoperability Publication in the Official Journal of the European Union in edition L 96 of 31 March 2004, see: http://europa.eu.int/eur-lex/en/archive/2004/l_09620040331en.html

  10. Better co-operation between ANSPs, regulators, civil and military providers; Improved relations between airspace users and service providers; Improve safety, performance and efficiency levels; Create required future capacity at reasonable costs; Share airspace as a common resource disregarding national boundaries. Which opportunities ?

  11. Single Sky Committee (SSC) Industry Consultation Body (ICB) Co-operation with Eurocontrol Institutional Set-up

  12. Single Sky Committee • The Single Sky Committee assists the Commission • 2 representatives per Member State (civil & military representation) • Observers: Eurocontrol, European countries with aviation agreements (CH, NO, IS) • chaired by the Commission • Decision making process: • consultative (simple majority of MS) • regulatory (qualified majority of MS, 2/3 of weighted votes)

  13. SingleSky Committee (II) • Functions of the Committee: • Provide opinion on draft Commission implementing rules (regulations/directives/decisions) • Provide opinion on draft mandates to Eurocontrol • Policy guidance (SESAME) • (if needed) coordination of Community position within Eurocontrol • (in the future) address problems in connection with FABs 10 meetings so far, the next one on 22 September 2005

  14. Industry Consultation Body (II) Established by SES-regulation in order to provide Commission with advice by all stakeholders. Members: 4 ATSP (CANSO) 4 Manufacturing Industry (ASD formerly AECMA) 2 Airports (ACI) 5 Professional staff associations (Joint ATM Working Group (4), ECA/IFALPA (1)) 8 Airspace Users (IATA, AEA (2), IACA, ERA, ELFAA, EBAA, IAOPA) 2 CNS Service Providers (COM (1), NAV (1)) 1 Meteorological Service Providers (Aviation Meteorology Group)

  15. Industry Consultation Body Observers: 1 Eurocontrol 2 Non-European Interests (FAA and AIA) 1 Military (CMIC) 1 Research Establishments (EATRADA) 6 meetings so far, next meeting in October 2005 Current subjects of interest: SESAME, interoperability, new mandates ICB expresses expectations on new technology, timetable, priorities, orientation for research

  16. Eurocontrol The European Community has become a member of Eurocontrol besides the (presently 22) MS, relations with Eurocontrol are area of shared national and Community competence. Memorandum of Cooperation of December 2003 between the European Commission and Eurocontrol organises cooperation in the domain of Single Sky, Research, Statistics and GNSS Through mandates Eurocontrol contributes to the implemen-tation of the Single Sky.

  17. Mandates to Eurocontrol • Charging regime • Airspace design • Flexible use of airspace • Functional airspace blocks: report • Interoperability • AFTM, EUIR, AIP • Performance Review • Target level of safety

  18. European upper information region (EUIR) Functional airspace blocks (FAB) Flexible use of airspace (FUA) National Supervisory Authorities (NSA)/Designation (certification ANSP) ATCO-licence Interoperability SESAME Extension to 3rd countries Implementation

  19. Reorganisation of the Airspace - EUIR • Establishment of an European Upper Information Region (EUIR) by merging all UIRs controlled by European Member States above FL 285 and within the EUR and AFI ICAO regions. • Shall be negotiated and agreed within ICAO. • Possibility to extend to airspace outside the EUR and AFI ICAO regions (choice of MS).

  20. Reorganisation of the Airspace - EUIR

  21. Reorganisation of the Airspace - FAB • Establishment of Functional Airspace Blocks (FAB) in the upper (and possibly lower) airspace. • Objectives: • Reduce fragmentation, • Take into account traffic flows and not national borders, • Increase co-operation, • Increase harmonisation, • Provide efficiency gains.

  22. MS to develop FABs according to 7 criteria: safety case; optimum use of airspace, taking into account air traffic flows; overall added value, including optimal use of technical and human resources, on the basis of cost-benefit analyses; ensure a fluent and flexible transfer of responsibility for ATC; ensure compatibility between upper and lower airspace; comply with regional agreements concluded within ICAO; respect regional agreements, in particular those involving European third countries. Reorganisation of the Airspace - FAB

  23. Reorganisation of the Airspace - FAB • Bottom-up approach: • MS are fully responsible to initiate and set-up FABs, • FABs can include all or parts of a State’s Airspace, • For multinational FABs, all States involved must agree on the respective FAB, • No single “blueprint” for FABs, we expect different models to be implemented. • But, these FABs shall meet the 7 general criteria of the regulation.

  24. Reorganisation of the Airspace - FAB • Based on the experience of States/ANSPs when setting up FABs, the Commission will develop binding general principles for establishment and modification of FABs; • The extension of FABs to lower airspace (below FL 285) will be studied by the Commission before the end of 2006; • The Commission will review the functioning of the bottom-up approach by early 2009 and propose additional measures, if necessary.

  25. Reorganisation of the Airspace - FUA • Flexible Use of Airspace (FUA): • Support civil/military co-operation within FABs and between different FABs, • Establishes mandatory rules and criteria for application of FUA, • Harmonizes conditions of access and freedom of movement within the airspace. • Civil/military coordination in airspace management and air traffic management. • Regional/cross-border application of FUA.

  26. NSA • Establishment or nomination of National Supervisory Authorities since 20 April 2004. • Requirements: • (At least) functional separation from ANSP. • Impartiality and transparency • Capabilities: • Technical expertise, • Sufficient manpower, • Sufficient financial resources.

  27. NSA • NSA need to co-operate. They can be established at regional level. • Tasks: • Certification of ANSPs, • Compliance monitoring, • (poss.) role in designation process • safeguarding role re declarations of conformity/suitability/verification under interoperability regulation . • Future: which role for EASA?

  28. Interoperability • Objective and scope: • Interoperability between the different systems, their constituents and associated procedures of the European ATM network, • Coordinated introduction of new agreed and validated concepts of operations or technology. • Three different tools: • Essential requirements. • Implementing rules. • Community specifications.

  29. Interoperability • Essential requirements: • Seamless operation, • Safety, • Civil-military coordination, • Support of new concepts of operation, • Environmental constraints, • Principles governing the logical architecture, • Principles governing the construction of systems. Essential requirements are compulsory (Annex II of interoperability regulation).

  30. Interoperability • Implementing rules: • Shall determine any specific requirement that complements or refine the Essential Requirements, • Shall also describe the coordinated introduction of new, agreed and validated concepts of operation or technology. Implementing rules are compulsory (prepared by Eurocontrol and adopted by EU-Commission).

  31. Interoperability • Community specifications are means of compliance European Standards (drawn up by CEN/CENELEC/ETSI in cooperation with EUROCAE) or Eurocontrol specification(for operational coordination) (Systems, procedures and constituents which meet Community specifications are presumed compliant with mandatory rules)

  32. SESAME SESAME is the Single European Sky Implementation Programme to modernise ATC infrastructure. Synchronises the implementation of new equipment in the EU by ensuring that airborne equipment is consistent with ground technology. Initialised by ATM equipment manufacturers, it is now supported by the whole air transport community.

  33. Why SESAME? Traffic will more than double by 2025! ATM is still using ageing technology from 70s, even 50s with virtually no automation at all Possible with current operating principles? ?

  34. Turn off the fragmented ATM approach Synchronise and integrate plans from research to operations Combine technical/operational solutions with the institutional/ regulatory/ financial instruments of the European Commission SESAME will plan, research, develop, implement SESAME

  35. Two main phases: Definition Phase (2005-2007) Deliver a European ATM Master Plan for 2007-2020 Implementation Phase (2007-2020) Development and deployment of new generation ATM systems Incremental approach, phased in 3 « packages » SESAME

  36. SESAME – Definition phase • Definition phase launched, will run up to 2007 • Run under Eurocontrol’s operational responsibility • Deliverable: ATM Master Plan for 2020, which will define a common goal and vision for the development of the European air traffic control infrastructure

  37. Industrialisation Deployment Deployment Foundation • Innovative R&D Applied R&D Industrialisation Deployment Applied R&D Industrialisation Applied R&D Industrialisation Applied R&D Industrialisation Applied R&D Industrialisation Applied R&D Industrialisation Deployment Deployment Deployment Deployment Applied R&D Industrialisation SES Deployment Collaborative – High Performance ATM SESAME – Implementation phase 2005 2010 2015 2020 Definition Phase 2005 2010 2015 2020 Accompanying technical/operational solutions with regulatory instruments

  38. Proposed Governance Structure • The Commission proposes to set up a Joint Undertaking: • Separate legal entity • Community and other parties (public and private) can be members • Eurocontrol is proposed to be a founding member, together with the Community • Oversight by Member States through the Single Sky Committee

  39. SINGLE SKY COMMITTEE SINGLE SKY COMMITTEE ADMINISTRATIVE BOARD ADMINISTRATIVE BOARD CONSEIL D CONSEIL D ’ ’ ADMINISTRATION ADMINISTRATION Usagers Usagers (4) (4) (4) Users Users Services NA (3) Services NA (3) ANSPs ANSPs (3) Community Communaut Communaut Community é é Eurocontrol Eurocontrol Eurocontrol Eurocontrol Autre Other Members Autre Other Members Membre Membre ) ) ) (10) (10) (10) (10 (10 (10 A A é é Airports roports Airports roports (2) (2) (2) Manuf Manuf . . Ind Ind Equipement Equipement (1) (1) (1) EASA, MILITARY, STAFF EASA, MILITARY, STAFF Administrative board Taking into account conclusions from the SDG study Mapping industry representation on Definition Phase

  40. Tasks and responsibilities • The SESAME JU will be the ‘owner’ of the ATM Master plan: • Organise Research & Validation activities, and complementary technical studies • Common components (paper, soft or hardware) definition and/or procurement activities, as defined in the ATM Master Plan • JU will be a light structure and rely on external technical resources • Eurocontrol • Other members • Specific technical working groups

  41. Funding • An estimated 300 M€ p.a. are foreseen (to be confirmed and detailed in the definition phase): • R&D Framework programmes • Industry funding • TEN-T funding • Eurocontrol funding • Route charges under Common Projects charging scheme • ANSPs • Third country members • Funding can also be ‘in kind’

  42. Relations with third countries • The full potential of the SES (“seamless operation”) will only be reached by enlarging its scope • “The Community shall aim at and support the extension of the SES to countries which are not members of the EU. To that end, it shall endeavour, either within the framework of agreements concluded with neighbouring third countries, or within the context of Eurocontrol, to extend the scope of this Regulation to those countries”. (Article 7 of the Framework regulation)