This document provides an overview of the work package related to Beam Interaction Devices (BIDs) presented by R. Folch. The agenda includes discussions on functional requirements, FLUKA simulations, and thermo-mechanical analyses. Notable participants include A. Christov and M. Delonca, who will cover critical topics such as the conceptual design and controls for movable BIDs. A collaborative discussion will conclude the session, emphasizing the manufacturing strategy and operational specifications to enhance accelerator performance and provide safety measures during the linac and synchrotron operations.
E N D
Agenda https://indico.cern.ch/conferenceDisplay.py?confId=181008 End 12:00 Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’) BREAK (15’) Conceptual and detailed design – M. Fürtinger (25’ + 5’) Controls for movable BIDs – R. Folch (10’ + 5’) Manufacturing strategy – R. Folch (15’) Discussion – All (15’) R. Folch EN/STI - BID Workpackage Review - March 2012
II. Functional requirements Reference document R. Folch EN/STI - BID Workpackage Review - March 2012
General specification R. Folch EN/STI - BID Workpackage Review - March 2012
To allow the operation of the linac while the synchrotron is open for access Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
To suppress the beam halo, to reduce the beam size and to measure the beam Beam Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
Horizontal: to intercept particles from scrapers. Vertical: to dump on request Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
To stabilize and diagnose beam spills for clinical purpose Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
To stop the beams in the irradiation rooms, as a second protection measure Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
For beam commissioning and accelerator performance check Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012
Agenda https://indico.cern.ch/conferenceDisplay.py?confId=181008 End 12:00 Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’) BREAK (15’) Conceptual and detailed design – M. Fürtinger (25’ + 5’) Controls for movable BIDs – R. Folch (10’ + 5’) Manufacturing strategy – R. Folch (15’) Discussion – All (15’) R. Folch EN/STI - BID Workpackage Review - March 2012
Reference document R. Folch EN/STI - BID Workpackage Review - March 2012