An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENVE 420IndustrialPollutionControl Sources and Characteristics of Wastewaters Industrial Waste Survey Dr. Aslıhan Kerç

  2. SourcesandCharacteristics of Wastewaters • In any plant there will be statistical variation in waste-flow characteristics. • Variations depend on: • Diversity of products manufactured • Process operations • Process type (batch or continuous)

  3. SourcesandCharacteristics of Wastewaters • Wide variation in waste flow and characteristics will also appear among similar industries. Due to: - Difference in housekeeping - Water reuse - Variations in production processes Waste loadings and their variations should be determined by industrial waste surveys

  4. INDUSTRIAL WASTE SURVEY • Develop a flow and material balance for all processes - using water - producing wastes • Establishthevariation in wastecharacteristics - fromspecificprocessoperations - fromthewholeplant

  5. INDUSTRIAL WASTE SURVEY Survey Results are used to determine: - Possibilities for water conservation and resue - Variations in flow and in strength (important information for the design of treatment facilities)

  6. Steps of Industrial Waste SurveySTEP 1 Develop a sewer map. Consult with the plant engineer, inspect various process operations. On the map: - indicate possible sampling stations - indicate estimated flow rates.

  7. Steps of Industrial Waste SurveySTEP 2 Establish sampling and analysis schedule Prefer composite samples weighted according to flow. Period and frequency of sampling should be established according to the process. e.g. Hourly composited on 8, 12.. 24 h basis If characteristics highly fluctuate  1h or 2h composite Samples from batch processes should be composited during the course of the batch dump.

  8. Steps of Industrial Waste SurveySTEP 3 Develop a flow and mateerial balance diagram - Collect survey data - Analyze samples - Flow-material balance diagram that considers all significant sources of waste discharge.

  9. Steps of Industrial Waste SurveySTEP 4 Establish statistical variation in significant waste characteristics.