An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 11 – Poseidon

  2. The Team • Simeon Eisen • Jeff Overweg • Aaron Maley • Jacob VanderWall

  3. Outline • The Problem • Design Decisions • Challenges • Looking Back • Looking Forward • Acknowledgements • Questions

  4. The Problem • Pool maintenance is time consuming and easy to neglect • There are systems available, but… they are costly and often are not convenient • An inexpensive, effective system would make the lives of pool owners simpler and create more time for proper leasure

  5. Design Decisions • Electronics: Processors and Communication • Atmel ATmega 644p & Atmel ATmega 328 • ZG2100 – 802.11b wireless interface chip • Graphic LCD with touch screen overlay • Electronics: Mechanical Control • Stepper Motors: 5VDC, Half H-Bridge drivers with step determinant logic • Solenoid Valves: 12VDC, Half H-Bridge driver • Pool Recirculation Pump: 120 VAC, Relay

  6. Design Decisions • Granule Dispensing • PVC Pipe • 3 Stepper motor driven feed screws • Solenoid valve channel switching • Anti-backflow valves • Sensing • Aquarium grade pH and ORP sensors • Diversion chamber with light turbulent flow • Op Amp/Instrumentation amplifier with running average data filtration

  7. Working Components

  8. Dispenser Output Data

  9. Challenges • Stepper control circuit

  10. Challenges • Wi-Shield documentation • Trial and error • Undocumented disabled pins • Rigorous Testing and research • Router differences • Incorporate instructions in user manual

  11. Looking Back • Improved definition of goals (vision) • Improved budgeting • Corporate sponsorship • Start prototype building earlier

  12. Looking Forward • Improved wireless capabilities • More memory for server • Incorporate Ethernet • Ball valve vs. solenoid valve • Shock factor! • Visual / Audible warning indicators • Larger screen

  13. Acknowledgements • Tim Therault– Industrial Consultant • Prof. VanderLeest – Team Advisor • Brian Honeck, Eric Walstra, Darryl DeBruin – CEAC Reviewers • Bob DeKraker – Parts Ordering • Phil Jasperse – Shop Help

  14. Questions?