1 / 5

Comments about Project X & 8 GeV Proton Physics program

Comments about Project X & 8 GeV Proton Physics program. Why the muon and kaon people should stop thinking about acquiring the Antiproton Source for 8 GeV proton physics program during Project X Or The Antiproton Physics Group should look at a long term program Keith Gollwitzer

gloria-todd
Télécharger la présentation

Comments about Project X & 8 GeV Proton Physics program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comments about Project X & 8 GeV Proton Physics program Why the muon and kaon people should stop thinking about acquiring the Antiproton Source for 8 GeV proton physics program during Project X Or The Antiproton Physics Group should look at a long term program Keith Gollwitzer Antiproton Source Fermilab

  2. Project X Layout What does this much beam from the Recycler mean 120 GeV fast extraction spill 1.5 x 1014 protons/1.4 sec 2 MW 8 GeV extraction 1 second x 2.25 x 1014 protons/1.4 sec 200 kW Recycler 3 linac pulses/fill Main Injector 1.4 sec cycle 8 GeV H- Linac 9mA x 1 msec x 5 Hz Stripping Foil Single turn transfer @ 8 GeV 0.6-8 GeV ILC Style Linac 0.6 GeV Front End Linac Taken from 1st workshop Project X Overview - McGinnis 2

  3. Project X & 8GeV Physics Program • Recycler to Accumulator • Large Ring to small ring • Ratio of circumferences is 7 • Injection scheme of filling aperture • Accumulator Aperture is 150% of Recycler • Debuncher Aperture is 600% • Beam current • 4 Project X linac pulses into Recycler and then to Debuncher means 22.5A of current. • Nightmare to get desired beam structure for kaon and muon experiments

  4. Project X & 8GeV Physics Program • Dave McGinnis and I met with representatives from both the kaon and muon groups • 8 GeV proton beam to the Antiproton Source using the Project X linac does not appear feasible • 8 GeV proton beam fed from Booster to Antiproton Source is probably on the edge • Suggested that they explore “new” rings of the size of the Recycler or larger (TeV tunnel?)

  5. Project X & Antiproton Physics • With the current Antiproton Source, stacking 10% of the time means that effect on 120GeV neutrino program is a loss of 10% of 1/6 of the available 120GeV protons. (nearly the same for pre-Project X) • We should be looking at a long term program • No end date due to Project X completeion

More Related