1 / 9

FILING OF VFR FLIGHT PLANS

FILING OF VFR FLIGHT PLANS. FPL 2012 TASK FORCE – 10 JUNE 2011. PANS-ATM. CURRENT: IF A FLIGHT PLAN IS FILED >24HRS IN ADVANCE OF EOBT, THE PLAN IS HELD IN ABEYANCE UNTIL MAXIMUM OF 24 HRS BEFOR FLIGHT BEGINS SO AS TO AVOID THE NEED FOR THE INSERTION OF DATE GROUP INFORMATION. PANS-ATM.

gmobley
Télécharger la présentation

FILING OF VFR FLIGHT PLANS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FILING OF VFR FLIGHTPLANS FPL 2012 TASK FORCE – 10 JUNE 2011

  2. PANS-ATM CURRENT: IF A FLIGHT PLAN IS FILED >24HRS IN ADVANCE OF EOBT, THE PLAN IS HELD IN ABEYANCE UNTIL MAXIMUM OF 24 HRS BEFOR FLIGHT BEGINS SO AS TO AVOID THE NEED FOR THE INSERTION OF DATE GROUP INFORMATION

  3. PANS-ATM AMENDMENT 1: ‘IF A FLIGHT PLAN IS FILED MORE THAN 24 HOURS IN ADVANCE OF THE ESTIMATED OFF-BLOCK TIME OF THE FLIGHT TO WHICH IT REFERS, THE DATE OF THE FLIGHT DEPARTURE SHALL BE INSERTED IN ITEM 18 OF THE FLIGHT PLAN.’

  4. PANS-ATM AMENDMENT 1: IN ADDITION TO THE USE OF DOF ON FIELD 18, FIELD 18 INFORMATION WILL ALSO BE INCLUDED IN OTHER FLIGHT PLAN RELATED MESSSAGES E.G. CNL, DLA, CHG & DEP

  5. IMPACT ASSESSMENT • DOF CURRENTLY NOT PROCESSED IN NATS AIRPORT SYSTEMS • VFR PLANS FILED DIRECT TO AIRPORT SYSTEMS • AT MERCY OF PILOTS FILING THESE PLANS AND THE POTENTIAL FOR PLANS BEING SENT FROM SYSTEMS NOT USING REVISED FORMAT INCLUDING INTERNET BASED SYSTEMS

  6. IMPACT ASSESSMENT • ADDITION OF DOF IN FIELD 18 REQUIRES SUBSTANTIAL SOFTWARE CHANGE AND ESTABLISHMENT OF DATABASE TO STORE FUTURE PLANS • INCLUSION OF FIELD 18 IN, E.G. DLA, CNL, CHG MESSAGES ALSO REQUIRES SUBSTANTIAL SOFTWARE CHANGE • MUST BE ABLE TO MATCH UPDATE MESSAGES WITH THE CORRECT PLAN

  7. IMPLICATIONS • MATCHING PROCESS FOR APPLYING UPDATES USES A/C IDENTIFICATION, DEP A/F, DEST A/F & EOBT. POST-2012 DOF MUST ALSO MATCH • EASY TO HAVE DOF IN MAIN FPL MESSAGE BUT IF TRANSMITTING SYSTEM STILL SENDING UPDATE MESSAGES WITHOUT IT, THEN THE UPDATE WILL BE LOST • DEP MESSAGE ONLY ON DAY OF FLIGHT BUT FLIGHT MAY NOT BE UP TO DATE • OVERDUE ACTION MAY NOT BE TAKEN

  8. IMPLICATIONS • OUTSIDE AGENCIES NEED TO BE ABLE TO ACCEPT (OR VICE VERSA) ALL MESSAGES THAT INCLUDE DOF OR ELSE UPDATES WILL BE LOST • DEPENDENCY ON NEIGHBOURS – MAY NOT ACCEPT INTERNAL FILING OF PLANS >24HRS IN ADVANCE BUT SHOULD ACCEPT AND PROCESS SUCH PLANS FILED EXTERNALLY • COORDINATION WITHIN THE EUR REGION IS VITAL

  9. CONCLUSION THREE POSSIBLE WAYS FORWARD: • ALL EUR STATES ALLOW FILING OF VFR FLIGHT PLANS >24HRS IN ADVANCE IAW WITH AMENDMENT 1 TO PANS-ATM • ALL STATES PROCESS PLANS FILED EXTERNALLY EVEN IF THEY DO NOT ALLOW INTERNAL FILING >24HRS IN ADVANCE • NO FILING OF VFR FLIGHT PLANS >24HRS IN ADVANCE IN EUR REGION

More Related