An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eastern Region Update & Opportunities Dwayne K. Cook Regional Operations Director Eastern Region April 30, 2008

  2. Eastern Region Update • Tunnel Fire, Life & Safety Improvements Program • Traffic Management System • Phase III Infrastructure build out and software integration • Travel Time • RTE 164 Design • Regional Concept of Transportation (RCTO) • Hurricane Evacuation Gate Installation • Stop Gate & Security Initiatives • JRB Incident Response & Wrecker services • Consultant supplemental staffing at tunnels

  3. Eastern Region Update • Tunnel Fire, Life & Safety Improvements Program • Traffic Management System • Phase III Infrastructure build out and software integration • Travel Time • RTE 164 Design • Regional Concept of Transportation (RCTO) • Hurricane Evacuation Gate Installation • Stop Gate & Security Initiatives • JRB Incident Response & Wrecker services • Consultant supplemental staffing at tunnels

  4. Eastern Region Update • Tunnel Fire, Life & Safety Improvements Program • Traffic Management System • Phase III Infrastructure build out and software integration • Travel Time • RTE 164 Design • Regional Concept of Transportation (RCTO) • Hurricane Evacuation Gate Installation • Stop Gate & Security Initiatives • JRB Incident Response & Wrecker services • Consultant supplemental staffing at tunnels

  5. Eastern Region Opportunities • Tunnel Fire, Life & Safety Improvements Program • HRBT Eastbound Lighting Replacement • Region-wide High Mast Lighting Evaluation, Design & Replacement • High Rise Bridge DMS Replacement • HOV/Reversible Roadway DMS Replacement • TMC Video Wall Replacement • MMMBT Fiber Optic Cable Repair/Replacement • Life Cycle Efforts (Tunnels & TMC)

  6. Midtown TunnelCorridor Project Estimated cost: $1.2 billion Solicit Conceptual Proposals – Early 2008 Solicit Detailed Proposals – Spring 2009 Proposal Selection – Spring 2010 Construction Phase Summer 2010-2015 Operations/Tolling Phase – Late 2015 • What’s being done? • In early 2008, VDOT will be soliciting a Public-Private Transportation Act (PPTA) partnership to improve the Midtown Tunnel Corridor. The effort includes the Midtown Tunnel, Downtown Tunnel and Martin Luther King Freeway, including: • construction of a parallel Midtown Tunnel • extension of the MLK from I-264 to London Boulevard • maintenance and safety improvements to the Midtown and Downtown tunnels • modifications to the Brambleton Avenue Interchange • operations and maintenance of the facilities • tolling

  7. Six Year Improvement Plan & Outlook • Capital improvement program funding is diminishing in the out years • Large number of proposed project opportunities in Eastern Region are in Urban Program

  8. Questions ?