An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RBSP EFW SMASafety and Mission Assurance Instrument - Critical Design Review Performance Assurance Team: Ron Jackson and Jorg Fischer RBSP-EFW SMA I-CDR 2009-09-30

  2. RBSP EFW SMASafety and Mission Assurance • System Safety • Status of inputs to the Missile System Prelaunch Safety Package (MSPSP) – UCB provided input for PDR and will provide any further safety input upon request . • There are no safety compliance issues with the EFW Instrument. • Labels and signs around equipment, warning of high voltage (250V). • Instrument safety: ESD and contamination training for all EFW personnel RBSP-EFW SMA I-CDR 2009-09-30

  3. RBSP EFW SMASafety and Mission Assurance • Flow down of performance assurance requirements • Compliance verification of purchase orders, specifications, and product • Procurement of EEE parts directly from the manufacturer or through authorized distributors. • Vendor Audits • Require full traceability on all flight procurements • Track GIDEPs Alerts • Performance Assurance Matrix Status 7417-9096-05_EFW-UCB Instrument Performance Assurance Matrix Rev A • Compliance 560 items • Compliance with caveats 10 items • Not compliant 0 items • Closed 100% IT Security: Compliance 46, Compliance with caveats 53, Not compliant 1 • Waiver status - Approved Waivers: 9 - Conditionally approved Waivers: 3 and Open: 1 RBSP-EFW SMA I-CDR 2009-09-30

  4. RBSP EFW SMASafety and Mission Assurance • Reliability RBSP-EFW SMA I-CDR 2009-09-30

  5. RBSP EFW SMASafety and Mission Assurance • Parts • All EEE parts are procured and or screened to EEE-INST-002, Level 2 • JANTX devices have a five piece DPA performed • JANTXV have 100% PIND test performed • UC1526AJ/883B, IRHLNJ797034SCS in review for radiation approval RBSP-EFW SMA I-CDR 2009-09-30

  6. RBSP EFW SMASafety and Mission Assurance • EEE Parts - Long lead item status • All EEE parts are 58ACS164, due 11/24/09 • AD822AN, Test at GSFC – due mid November 2009 • MAX256, Test at GSFC – due mid November 2009 • IRHLUB770Z4, due 9/17/09 • IRHLNA797064SCS (JANSR2N7622U2), due 11/21/09 • IRHNJ597130SCS, on order – due date December 4, 2009 • IRHLNJ797034SCS, on order – due date October 8, 2009 • MBRS4201T3, Test at GSFC – due mid November 2009 • Delivered by APL: RTAX2000, APL UT54LVDS031, UT54LVDS032 • GIDEP Status • List any pending GIDEP/NASA Alert open issues and status of resolution Status is listed in the RBSP-EFW_QA_ALERTS document. Alert Quantity 108, Alert Closure Rate 100%, Impact Alerts 1 RBSP-EFW SMA I-CDR 2009-09-30

  7. RBSP EFW SMASafety and Mission Assurance • Materials and Processes • Materials selection and screening plans per Matrix section 12 • Regular PMPCB review/approval status meetings RBSP-EFW SMA I-CDR 2009-09-30

  8. Instrument/Suite Name Systems Assurance - continued • Limited Life Items • EFW has no limited life items. However, there are a number of items that are tracked on as use basis Items tracked are: • Connector Mate / Demate, EFW • SPB Pin Puller Firings, SPB • AXB Frangibolt Firings, AXB • Boom Deploy, SPB and AXB • Flash Memory Erase Cycles, DCB • EEPROM Writes, DCB • Software Assurance • Delivered Flight software and Ground support software • Track software problems via PFRs • Ensure Software PFRs are closed RBSP-EFW SMA ICDR 2009-09-30

  9. Instrument/Suite Name Systems Assurance - continued • Configuration Management • Configuration management process being used: RBSP_EFW_PA_010A_CM • Mechanical drawings are maintained on PDM Works Solid Works data base • Electrical drawings are maintained on the UCB CM data base • EFW Indentured Drawings List: RBSP_EFW_CM-002 • ESD Control • ESD requirements met per S20.20-2007: • Training of EFW personnel • ESD certification of workbenches • Contamination Control • Contamination control per RBSP_EFW_PA005B • Special needs during Instrument and SC INT: • Class 100,000 clean room available • Above 30% up to 50% humidity and 70F +/- 5F, when not at test • Clean room compatible garments should be worn • Instrument should be bagged, when outside of clean room • Protect DAG-213-coated sensor surfaces (no cleaning; no touching) RBSP-EFW SMA ICDR 2009-09-30

  10. RBSP EFW SMASafety and Mission Assurance • Flight Unit Travelers • Sample traveler developed for electrical and mechanical ETUs. • Available draft travelers reviewed by SMA at end of ETU assembly and test flow. • Flight traveler generation to begin with Flight assembly in Q4 2009. • Inspection Flow, MIPs, Fabrication & Assembly Instructions (FAI) • Describe Audit Traveler data packages at each inspection point • Check sign-offs, traceability, document revisions, etc. • Verify acceptable lab humidity and temperature • Printed Wiring Assemblies • Inspect workmanship, parts placement and orientation • Verify PWA cleanliness • Polymerics • Inspect per NASA standard, FAI, drawings • Check mix records, durometer hardness of cure samples • Cables, Harness, Wiring • Inspect crimps, solder and workmanship to NASA Standards • Inspect to NASA standard, FAI, drawings • Other Inspections • Incoming/Receiving, Kitting, Pre-cap, Calibration of equipment, and Instrument testing • Check Mate/De-Mate and Power-on/Power-off logs. RBSP-EFW SMA I-CDR 2009-09-30

  11. RBSP EFW SMASafety and Mission Assurance • Nonconformance Problem / Failure Reporting Process (PFR) • The Problem/failure reporting process starts at Flight testing • PFRs tracked via database • PFR, failure mode is verified, disposition reviewed and approved. Rework/repair process reviewed and approved. • Status of existing and new PFRs reviewed in weekly EFW team meeting. • A PFR report will be issued within 24 hours of a nonconformance. It will also be reported in the monthly status report. • PFR approvals required by: Cog E., Systems E., QA, PM. • APL (Project) has approval authority for dispositions. RBSP-EFW SMA I-CDR 2009-09-30

  12. RBSP EFW SMABackup Slides RBSP EFW SMASafety and Mission Assurance Backup RBSP-EFW SMA I-CDR 2009-09-30

  13. RBSP EFW SMABackup Slides - Documents • Deliverable documents to be available at the review (delivery due date prior to the review – see CDRL) • Deviations/Waivers (CM-002-004) • Performance Assurance Matrix – update (MA-001-001C) • Limited Life Items List – baseline (MA-002-009B) • As-Designed Parts List (MA-005-002B) • Long Lead Items List – as applicable (MS-006-002) • As-Designed Materials and Processes List – (SE-007-009B) • Software Requirements Document – baseline (SW-002-001B) • Available documents at the review • Contamination Control Plan (SE-008) • GIDEP ALERTS document (RBSP-EFW_QA_ALERTS) • Configuration Management Plan (RBSP_EFW_PA_010A_CM) RBSP-EFW SMA I-CDR 2009-09-30

  14. RBSP EFW SMABackup Slides – CM DB • UCB Configuration Management Data Base RBSP-EFW SMA I-CDR 2009-09-30

  15. RBSP EFW SMABackup Slides – PFR Form RBSP-EFW SMA I-CDR 2009-09-30

  16. RBSP EFW SMABackup Slides – EEE Parts DB RBSP-EFW SMA I-CDR 2009-09-30

  17. RBSP EFW SMABackup Slides - MIL • MIL - RBSP_EFW_SE-007 RBSP-EFW SMA I-CDR 2009-09-30

  18. RBSP EFW SMABackup Slides - Calibration • Calibration Data Base RBSP-EFW SMA I-CDR 2009-09-30

  19. RBSP EFW SMABackup Slides - Training RBSP-EFW SMA I-CDR 2009-09-30

  20. RBSP EFW SMABackup Slides – EEE Parts Storage • UCB RBSP-EFW Incoming Inspection and Bonded Storage RBSP-EFW SMA I-CDR 2009-09-30

  21. RBSP EFW SMABackup Slides – Inspection Area RBSP-EFW SMA I-CDR 2009-09-30