Schedule for mockup assembly. SPE, gain measurement & HV setup. Pre. Analysis. Data taking with sources & Analysis. LS filling. Measurement of SPE, gain. Source Calibration. SPE with diffuse ball. Data Analysis. Gd mass production and Loading. Mockup assembly
E N D
Schedule for mockup assembly SPE, gain measurement & HV setup Pre. Analysis Data taking with sources & Analysis LS filling Measurement of SPE, gain Source Calibration SPE with diffuse ball Data Analysis Gd mass production and Loading
Mockup assembly • LS filling : 이재승, 박정식, 박강순 • Target, Gamma catcher 는 완료 (각각 150L, 802L : G.C. 목(chimney 시작부분) 까지) • 나머지 buffer (mineral oil)는 오늘 중으로 모두 채울 예정 ( 현재 4233L : G.C. 목 까지 ) • On going processes for Mockup daq • SPE measurement with diffuse ball : 백승록 • 각 채널의 PMT gain 측정 HV 값 수정 • Dark current measurement : 정인석 • rate measurement : random trg 경우 • fitting 결과를 Hamamatsu 데이터와 비교 • Set the MC parameters : 정인석 • Event Build : 백승록 • Converting data format & preparing manual for how to use it : 박정식 • Raw data format final data format • Energy calibration with sources : 백승록, 정인석, 김동현, 박정식
LS filling Gamma catcher Target Buffer Target 적산계 LS filling Flowmeters
LS filling 1 1 2 3 2 3
1 Chimney에 후레쉬 삽입 동영상 2 3