This paper presents a new reachability algorithm tailored for symmetric multi-processor (SMP) architectures, addressing the complexities of multithreaded reachability analysis. It discusses engineering issues, including thread safety and deterministic behavior, and proposes strategies to enhance parallelism and performance while minimizing cache misses. Results from extensive testing on both industrial circuits and public benchmarks affirm the improvements provided by this approach. The work concludes by emphasizing future directions in multithreading optimization and cache behavior analysis for reachability analysis.
E N D
A New Reachability Algorithm for Symmetric Multi-processor Architecture D. Sahoo, Stanford J. Jain, Fujitsu S. Iyer, UT-Austin D. Dill, Stanford Formal Equivalence and Assertion-based Verification Workshop 2005
Outline • Standard Reachability Analysis • Multithreaded Reachability • Multithreaded Reachability in SMP machines • Engineering Issues • Results • Conclusion and Future Work
Related Work • Parallel Reachability Analysis: • Stern and Dill [CAV, 97] • Stornetta and Brewer [DAC, 96] • Yang, Hallaron [97] • Heyman, Geist, Grumberg, Schuster [CAV, 00] • Garavel, Mateescu, Smarandache [SPIN, 01] • Pixley, Havlicek [03]
Reachability using BDD [Burch et al. : 91] Partitioned Transition Relation Initial State I … … R1 Image computation Trn Tri Tr1 R2 Least Fixed Point Ri
Local Fixed Point 1 Local Fixed Point 2 Local Fixed Point 3 Local Fixed Point 4 Partitioned Reachability using POBDD POBDD - [Jain : 92] Reachability - [Narayan et al. : 97] I Initial States : I
Local Fixed Point 3 Local Fixed Point 4 Communicate from 1 -> 2 Communicate from 1 -> 4 Communicate from 1 -> 3 Partitioned Reachability using POBDD POBDD - [Jain : 92] Reachability - [Narayan et al. : 97] I Initial States : I Local Fixed Point 1 Local Fixed Point 2
Local Fixed Point 1 Local Fixed Point 2 Local Fixed Point 3 Local Fixed Point 4 Communicate from 2 -> 1 Communicate from 2 -> 3 Communicate from 2 -> 4 Partitioned Reachability using POBDD POBDD - [Jain : 92] Reachability - [Narayan et al. : 97] I Initial States : I Similarly repeat for other partitions
Local Fixed Point 1 Local Fixed Point 2 Local Fixed Point 3 Local Fixed Point 4 Partitioned Reachability using POBDD POBDD - [Jain : 92] Reachability - [Narayan et al. : 97] I Improvements: [Iyer et al. : 03] [Sahoo et al. : 04]
Motivation for Multi-threaded Approach • Scheduling Problem • Increasing availability of powerful SMP machines • Multi-threading is a way of achieving real parallelism in SMP machines
Multi-threaded Reachability [DAC 05] Naïve parallelization Time • Advantage: • Parallel speedup • Catch a bug faster than the sequential version • Problems: • Not much parallelism
Multi-threaded Reachability [DAC 05] Early Communication Time • Advantage: • Parallel speedup • Finishes the reachability analysis faster • Catches bug faster than the naive version • Problems: • Parallelism could be better
Multi-threaded Reachability [DAC 05] Early Communication and Partial Communication Time • Advantage: • Parallel speedup • Finishes the reachability analysis faster • Catches bug faster than the previous versions
Reachability in SMP Architecture Time • We find the bugs faster ! • Improved parallelism • Better parallel speedup
Engineering Issues • Thread-safe BDD library • Deterministic behavior • Smart thread scheduling
Extensive memory based optimizations Pointer comparisons Hashing based on memory address Solutions: Deterministic Hashing Deterministic comparisons Sources of Non-determinism Thread 1 Thread 2 p = malloc (…) p = malloc (…) key = hash(p) if (p > p1) …
Thread synchronization Solutions Synchronization based on deterministic count Number of ITE operations Number of Sift operations Sources of Non-determinism Thread 1 Thread 2 Image #n Image #n+1
Smart Thread Scheduling Thread • Each processor has its own cache • Thread is assigned to a processor • The cache fills up with the thread’s memory usage. • The same thread assigned to a different processor after sometime • A large number of unnecessary cache miss when the thread use its previously used memory locations • Solutions: • Bind thread to a processor • Leads to suboptimal throughput • If the number of threads exceeds the number of processors CPU2 CPU1 Cache2 Cache1 0x07ffd0 Lookup 0x07ffd0 Cachemiss
Results : Gantt charts Real execution traces from our multi-threaded reachability program
Conclusion and Future Work • Parallelize the Reachability • Multi-threaded Reachability • Better results • Deterministic behavior • Future Work • Improve the parallelism further • Study cache behavior