IEEE PES PHOENIX SECTION. ― SUBSTATION COMMITTEE PRESENTATION―. MARCH 21,2008. Substations Committee Scope. Substations Committee Objectives. Substations Committee Organization. Data Acquisition Processing and Control Systems Subcommittee “ C0 ”.

harley
Télécharger la présentation

MARCH 21,2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE PES PHOENIX SECTION ― SUBSTATION COMMITTEE PRESENTATION― MARCH 21,2008

  2. Substations Committee Scope

  3. SubstationsCommittee Objectives

  4. Substations Committee Organization

  5. Data Acquisition Processing and Control Systems Subcommittee “C0” Treatment of all matters relating to data acquired within sub-stations and its processing for monitoring, analysis and local and/or remote control of substation apparatus and devices connected to the substation. • Working Group C1- Application of Computer-Aided Systems to Substation. • Working Group C3 - Electric Network Control Systems Standards • Working GroupC5- Standard For Electric Power System Device Function Number and Contact Designations. • Working Group –C6 Trial use Standard for a Cryptographic Protocol for Cyber Security of Substation Serial Link

  6. Transmission and Distribution Subcommittee “D0” Responsible for treatment of all matters pertaining to the design, construction and operation of Transmission and Distribution Substations, and the application of switching devices and other equipment, instrumentation and protective and control equipment in Transmission and Distribution Substations. • Working group-D1: Lightning Protection of Substations. • Working Group D3: Substation Bus Design • Working Group D4: Substation Safety. • Working Group D5: Substation Insulation Coordination. • Working Group D6: Substation Grounding Measurements. • Working Group D7:Substation Grounding Design and Analysis. • Working Group D9: Permanent Connection in Substation.

  7. West Coast Subcommittee “F0” Within the scope of the Main Committee, to foster closer cooperation among and permit more active participation of the Western members in all projects authorized by the Committee, and to provide direct contact in the planning of Pacific Coast technical activities. • WorkingGroup -F1: Seismic Design Criteria For Substation. • Working Group -F2: Cable Systems in Substations. • Working Group -F3: Substation Fire Protection Practices.

  8. Substations Environmental Subcommittee “G0” Responsible for treatment of all matters relating to design and location of distribution and transmission substations as to their effect on the environment of the adjacent community. Special emphasis shall be made to the factors that must be considered in design such as aesthetic treatment, overall visual appearance, erosion control and oil spill containment. Audible noise, electromagnetic interference and electrical interference shall be considered as far as the zoning acceptance is concerned. • WORKING GROUP G1 - SLIDE LIBRARY • WORKING GROUP G2 - DESIGN & LOCATION OF SUBSTATIONS FOR COMMUNITY ACCEPTANCE. • WORKING GROUP G3 - SUBSTATION SECURITY

  9. Treatment of all matters relating to design, construction, and operation of AC substations using HV power electronics as part of the electrical power system, including FACTS and HVDC converter stations. This includes the application of HV power semiconductor equipment and all other components insofar as they affect the design, construction, and operation of such substations. Interest in such components is limited to their effects on overall station parameters and does not include the detailed design of the equipment itself High Voltage Power Electronics Stations-I0 • WORKING GROUP I1 - POWER ELECTRONIC EQUIPMENT • WORKING GROUP I3 – SAFETY ASPECTS OF HVDC TRANSMISSION • WORKING GROUP I4 – STATIC VAR COMPENSATORS (SVCs) • WORKING GROUP I5 – VOLTAGE SOURCED CONVERTERS (VSC)

  10. GAS INSULATED SUBSTATIONSSUBCOMMITTEE - K0 Review, study, and document design, application, installation, testing, operating and maintenance practices for gas insulated substations (GIS) of 72.5 kV and above, and identify the need for, and sponsor the preparation of, standards, guides, technical bulletins and other informative materials as related to the gas insulated substations and related technologies. Develop Guide for Application Medium Voltage Gas Insulated Substations 1kV up to 52 kV. Conduct GIS/GIL/SF6 tutorials, panel sessions. Develop GIL Application Guide. Review Maintenance and Operation of GIS/GIL. • WORKING GROUP K1 – STANDARDS AND GUIDES • TASK FORCE K1 TF2- APPLICATION GUIDE FOR MEDIUM VOLTAGE GAS INSULATED SUBSTATION, 1KV -52KV. • WORKING GROUP K2 –PUBLICATIONS AND INFORMATION DISSEMINATION • WORKING GROUP K3 – APPLICATION OF GIS TECHNOLOGY. • Task Force K3 TF1- GIL Application Guide • WORKING GROUP K4 – MAINTENANCE AND OPERATION OF GIS • Task Force K4-TF1- Operations and Maintenance – Series of User’s Group Meetings

  11. Substations Committee Annual Meeting San Francisco, CA April 05-April 11, 2008 http://thomasblairpe.com/ascm/ Substation Web page: http://www.ap-concepts.com/ieee_substations.htm

  12. Q2.1.1.(7)-(8) Stadard Usage

  13. Comments for Q2.1.1(1)-(8) based on Pre-Survey

  14. Q2.1.2.(1) Standard Bus Configuration -1

  15. Q2.1.2.(1) Standard Bus Configuration -2

  16. Q2.1.2.(1) Standard Bus Configuration -3

  17. Q2.1.2.(1) Standard Bus Configuration -4

  18. Q2.1.2.(2) Insulation Coordination

  19. Q2.1.2.(3) Allowable Minimum Clearance

  20. 2 Comments for Q2.1.2(1)-(3) based on Pre-Survey

  21. Q2.2 ConstructabilityQ2.2(1) Do you control construction deviations from design?

  22. Q2.2 Constructability

  23. 3 Q2.2 ConstructabilityComments for Q2.2(1)-(3) based on Pre-Survey

  24. Q2.3 Maintainability

  25. Q2.3 Maintainability Q2.3 (2) Do you have a formal feedback process of maintenance to modify engineering standards?

  26. Q2.3 Maintainability Q2.3 (3) Is maintenance involved in the conceptual stage of a substation project?

  27. 4 Comments for Q2.2 & Q2.3 based on Pre-Survey

  28. Q2.4 Optimized Technology, Repeatable design

  29. 5 Comments for Q2.4 based on Pre-Survey

  30. Q2.5.1-4 Engineering Quality Control

  31. Q2.5.1-4 Engineering Quality Control

  32. 6 Comments for Q2.5 based on Pre-Survey

  33. Q2.6 Use of Pre-engineering/-fabricated/-tested etc.

  34. 7 Comments for Q2.6 based on Pre-Survey

  35. Q3.1.1 What kind of Construction Method used to construct a new AIS?

  36. Q3.1.2 What kind of Method in cae of Expansions?

  37. Cmments for Q3.1.1-2 based on Pre-Survey

  38. Q3.2 What kind of Logistics Strategy?

  39. Q3.3 Do you adopt following design to deal with transportation restriction?

  40. 9 Comments for Q3.4 based on Pre-Survey

  41. Q3.5.1 How do you manage substation outage at the Expansion?

  42. Q3.5.2 How long is the Standard Shutdown Period in the Expansion on Daily Basis?

  43. Q3.5.3 How long is the Standard Expansion Period from the engineering design to the completion of expansion on a Monthly Basis?

  44. 9 Comments for Q3.5.1-3 based on Pre-Survey

  45. Q4.1.1 What Kind of Test do you require for Main Transformer?

  46. Q4.1.2 What Kind of Test do you require for Circuit Breaker?

  47. Q4.2 Training Requirement

  48. 9 Comments for Q4.2 based on Pre-Survey