Muon CampusSite Prep GPP UpdateFESS EngineeringDecember 5, 2012
Site Prep GPP History Site Prep GPP (original) - $3.2M • Relocate Kautz Road and gas line - $2.1M • New loop/redundant Feeder 24 - $1.1M Current lab-wide infrastructure upgrades: GPP – Master Substation Bypass SLI - new Master Substation - upgraded ICW upgrade Close Well No.1
Site Prep GPP Candidates • Site Prep GPP (New) - $?? • Pond Upgrades – Phase 1 - $0.5M (2014) – run g-2 (pumps and piping risk to project) • Pond Upgrades – Phase 2 - $1.0M-$1.5M (2017) – Pump and vault upgrades • New loop/redundant Feeder 24 - $1.0M (2016) • MI-52 Extension - $0.5M (2014) • Communication tie-in to AP-30 - $0.7M (2013) • Additional project risks: • - New CUB LCW heat exchanger and pumps - ? • - Chilled water piping replacement - ? • - PBarHVAC (electronic and building cooling) - ?