An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Campus AIP ReviewMC Infrastructure Upgrade GPP UpdateRuss AlberFESS EngineeringJanuary 23, 2013

  2. Site Prep GPP History Site Prep GPP (original) - $3.2M • Relocate Kautz Road and gas line - $2.1M • New loop/redundant Feeder 24 - $1.1M Current lab-wide infrastructure upgrades: GPP – Master Substation Bypass SLI - new Master Substation - upgraded ICW upgrade Close Well No.1

  3. “Infrastructure” GPP Candidates • Infrastructure GPP (New) - $?? • Required to run Projects • A-0 Cooling Options: • OPTION 1 Pond Cooling – • Phase 1 - $0.5M (2014) – run g-2 (pumps and piping risk to project) • Phase 2 - $1.0M-$1.5M (2017) – Pump and vault upgrades • OPTION 2 ICW - $?? • OPTION 3 Cooling Towers - $?? • MI-52 Extension - $0.5M (2014) • Possible Project Risks • Parallel Feeder 24 - $1.0M (2016) • New CUB LCW heat exchanger and pumps - ? • Chilled water piping replacement - ? • PBarHVAC (electronic and building cooling) - ?