TEMA is seeking qualified contractors for a turn-key project to purchase and install four 20KW generators complete with transfer switches at specified sites in West Tennessee, including Paris, Ripley, and Brownsville. The existing generator pad measures 67” x 36”, and the LP tank pad is 118” x 48”. The transfer switch is located inside the building on the left wall, with a clearance of 34” and a building size of 80” x 80”. Interested parties should refer to the site specifications and experience in similar installations is required.
E N D
Generator Pre-Bid TEMA is seeking to purchase and have installed four 20 Kw generators with transfer switches. Turn-key jobs All in West Tennessee
Paris Site • Existing generator pad is 67” X 36” • LP tank Pad is 118” X 48” • Transfer switch is inside building, on left wall.
Ripley Site Door – 36” Clearance – 34” Building inside 80” X 80”