Summary of the accelerator operations for the week including proton intensity, maintenance activities, and upcoming plans across various components. Detailed breakdown of work completed and plans for the Proton Source, Main Injector, NuMI, MTest, and NMuon. Explore the integrated intensity levels, beam hours, and progress made during this period. Access the detailed schedule and links for further information.

hide
Télécharger la présentation

Accelerator Operations Summary: October 7-14, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting October 14, 2013

  2. Accelerator Operation Summary From : October 07, 2013 (0000 hours) To: October 14, 2013 (0000 hours) Calendar Week # 41 NuMI Weekly Integrated Intensity 3.00 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuonWeekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 6.00 E12 protons Beam Hours To NuMI71.13 hours

  3. Status /Work Completed/Plans • Proton Source • Maintenance • Tuning & Studies • Main Injector • Installed MI-104 IPM • Repaired MI-52B septa • Removed MI-307 bellows • Increased Recycler aperture (301-304) • Bent beam pipe • Sagging beam pipe • No obstruction found • NuMI • Maintenance • Tuning • Switchyard • Maintenance • Work on extraction and beamline tuning • MTest • New experiment • Tuning • NMuon • Installing magnets and connecting instrumentation • NM2 polarity tests

  4. Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html