Receiving Inspection

Receiving Inspection. This is the inspection of the engine as it is removed from the aircraft and received at the overhaul site The purpose of the receiving inspection is to begin to detect engine defects or required maintenance and to schedule the overhaul process

hila
Télécharger la présentation

Receiving Inspection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Receiving Inspection • This is the inspection of the engine as it is removed from the aircraft and received at the overhaul site • The purpose of the receiving inspection is to begin to detect engine defects or required maintenance and to schedule the overhaul process • Look at the history of the engine as recorded in the logbook - hours, repairs, routine service, etc….. • Perform a conformity inspection to reveal unapproved accessories • Review the applicable AD records to determine which AD’s are required during overhaul

  2. Receiving Inspection / Disassembly

  3. Receiving Inspection • Review service bulletins • Review the overhaul manual and parts manual • In 370 lab you will also review the study guide • Perform a visual inspection to detect obvious external defects . Perform this inspection prior to cleaning the engine. Look at paint condition, signs of heat damage, fretting, and oil leaks. • Make an inventory of all extra parts received with the engine such as baffles, fittings, or ignition parts, so that nothing is lost

  4. Regulations Governing Overhaul • Time Before Overhaul ( TBO ) • The manufacturer determines the recommended number of hours that an engine may be operated before it is overhauled • Each engine model has a different TBO and they range from around 600 to 2400 hours • All engines wear, build-up sludge, form deposits, crack, and parts fail that cause them to require overhaul • Privately owned aircraft (Part 91) may exceed TBO if the engine shows no signs of deteriorated performance

  5. Regulations Governing Overhaul • Rebuilt is the term used to describe an engine that has been disassembled, inspected, repaired, reassembled, and tested utilizing new tolerances • Overhauled is the term to describe an engine that has been disassembled, inspected, repaired, reassembled, and tested utilizing serviceable tolerances • An engine equipped with an integral supercharger that has its case halves separated is a major repair and must be approved by an IA • An engine equipped with other than spur type propellor reduction gearing, that has its case halves seperated, is also a major repair

  6. Regulations Governing Overhaul • Any special repairs involving welding, plating,metalizing, or other nonstandard procedures is also a major repair