Travel Model One : Update and In-Progress Validation Results. David Ory (dory@mtc.ca.gov) Metropolitan Transportation Commission December 13, 2010 Presentation for Four Agency Modeling Group. Outline Schedule. Model overview. Roadway validation. Transit validation. Questions.

honey
Télécharger la présentation

Travel Model One : Update and In-Progress Validation Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Travel Model One: Update and In-Progress Validation Results David Ory (dory@mtc.ca.gov) Metropolitan Transportation Commission December 13, 2010 Presentation for Four Agency Modeling Group

  2. Outline • Schedule. • Model overview. • Roadway validation. • Transit validation. • Questions.

  3. Development and Application Schedule

  4. Google SF CBD Zone X Not work Work School 1Tour 1 Tour Not school Two cars Work and school locations selected Worker or student status (from census) Daily activity patterns chosen jointly Mandatory tours generated Household auto ownership level chosen

  5. 2 Joint Tours Zoo, Market 8 to 11; 3 to 4 7 to 7 8 to 4 1 At-work Tour McDonald’s 12 to 1 5 to 6 1 Non-mandatory Tour Jimmy’s House 2 Joint Tours 8 to 11, 3 to 4 Zoo, Market Mandatory tours are scheduled Non-mandatory travel is generated Destinations for non-mandatory tours are selected Non-mandatory tours are scheduled

  6. Drive to zoo; walk to market No stops Shared ride 2; Walk Drive; Drive; Drive Drive to work; drive to lunch Starbucks near home Transit to school; bike to Jimmy’s No stops Transit; Bicycle Shared ride 2; Walk Ride to zoo; walk to market No stops Mode choice for all tours Stop frequency; stop location; stop time Trip mode choice; parking location choice

  7. Roadway validation • Counts. Previous validation efforts did not locate a large number of counts on the highway network, instead focusing on bridges and screen lines. We spent a good deal of time locating Caltrans counts on our highway network, leaving no time for locating county-provided arterial counts. • Time-of-day. Previous validation efforts focused on daily and AM peak period estimates. We are now focusing on five time periods, as follows: early AM, 3 am to 6 am; AM peak, 6 am to 10 am; midday, 10 am to 3 pm; PM peak, 3 pm to 7 pm; and, evening, 7 pm to 3 am. • Speed. Previous validation efforts compared AM speeds to a few dozen observed speeds from floating car runs. We now have a full database of speeds from 511 for year 2005; we’ll focus 2005 validation effort on speeds.

  8. Roadway validation • Aggregate time-of-day results.

  9. Roadway validation • Specific (heavily-utilized) locations. Please note the observed data is presented as a range, the width of which is determined by the sample size and standard deviation of the observed data (i.e. to give the reader a sense of the observed data quality) and is not intended to imply a reasonable range for the model results.

  10. Transit validation

  11. Questions?