1 / 4

Thoughts on OIB Science Team

Thoughts on OIB Science Team. KCJ. Acquisition Strategies. OIB developed 3, basic acquisition strategies February 2011 I. Establish once the bedrock topography grid and ice surface sampling epoch .

howe
Télécharger la présentation

Thoughts on OIB Science Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thoughts on OIB Science Team KCJ

  2. Acquisition Strategies OIB developed 3, basic acquisition strategies February 2011 • I. Establish once the bedrock topography grid and ice surface sampling epoch. • a) 5 km or less spaced flight lines parallel to elevation contours near coast and seaward of ice margin. • b) 10-20 km spaced flight lines parallel to elevation contours upstream. • c) Collect along center lines of most Greenland and Antarctic glaciers. • II. Extend coverage and repeat elevation measurements using high elevation lidar • a) Fill regions between low elevation flight lines • b) Repeat acquisitions in succeeding years for dh/dt • III. Use extended and base data to improve ICEsatslope errors, tie ICEsat and OIB to Cryosat, tie earlier data to ICEsat-2. July 2012 • Seasonal Strategy • 1) ICESat-2 continuity and a summer commissioning phase January 2013 • 1) OIB will fly a grid pattern the same glacier each season. • 2) OIB will fill coverage gaps so that regions are sampled at least once during OIB • 3) Remaining time devoted to acquisitions in support of ICESat and ICESat-2 science interpretation • 4) After 1-3 are complete, use remaining time to support other programs. Re-evaluate the strategies as we approach ICESat-2 http://bprc.osu.edu/rsl/IST/documents/Towards%20a%20Long%20Term%20OIB%20Flight%20Planning%20Strategy_2_15.docx http://bprc.osu.edu/rsl/IST/documents/OIB%20Land%20Ice%20Telecon%20May%20Minutes.docx http://bprc.osu.edu/rsl/IST/documents/Operation%20IceBridge%20-%20Seasonal%20Measurements%20-%20Final.docx

  3. Assessments • Science team validated data quality through intercomparisons (e.g. cross-overs). Should there be a focus on experiments designed to refine error model predictions? http://bprc.osu.edu/rsl/IST/index_files/datacomparison.htm • Science team struggled with assessing impacts? How best to assess progress towards objectives and scientific contribution?

  4. Reporting • Emphasize documenting impact of OIB on ICESat to ICESat-2 continuity. Will that reveal tweaks? • Should there be an annual OIB report on missions, progress towards objectives, and science accomplishments?

More Related