1 / 12

FERC TECHNICAL CONFERENCE MAY 24, 2001

This overview provides information on Transwestern Pipeline Company's current and projected pipeline capacity, historical utilization, interconnects with intrastate transportation systems, and proposed solutions for price controls and transportation infrastructure. It also discusses Transwestern's subscription levels, capacity release activity, subscription rates, capacity release rates, reserve margins, and storage.

idraper
Télécharger la présentation

FERC TECHNICAL CONFERENCE MAY 24, 2001

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FERC TECHNICAL CONFERENCEMAY 24, 2001 TRANSWESTERN PIPELINE COMPANY STEVE HARRIS VICE PRESIDENT

  2. OVERVIEW • Transwestern current/projected pipeline capacity and historical utilization • Interconnects between Transwestern and intrastate transportation systems • Proposed solutions - price controls vs. sufficient transportation infrastructure -Transwestern’s subscription levels -Capacity release activity -Transwestern’s subscription rates -Capacity release rates -Reserve margins & storage

  3. Current capacity 1.090 Bcf/d

  4. Proposed Red Rock Expansion • Incremental 150,000 MMBtu/day on mainline to California border • Projected in-service June, 2002 • Docket No. CP01-115, filed March 29, 2001 • Pending FERC approval • Resulting total mainline capacity to California border 1.240 Bcf/day

  5. Transwestern Interconnects withIntrastate Transportation System [Schematic of TW’s delivery point capacities at the CA border]

  6. (May, 2001) (June, 2002)

  7. Transportation Infrastructure Solutions • Remove downstream operational barriers to interstate expansion • Resolve intrastate bottlenecks • Come to agreement on appropriate reserve margin methodology • Normal vs. peak day • Low vs. high hydro year • Appropriate role of storage

  8. Establish an Environment Conducive to Electric Generators EG’s need: • Certainty of infrastructure • Certainty of supply • Certainty of regulatory parameters To be assured of ROE

More Related