1 / 40

2010-12 Accelerated Pulses Production Programme

Increasing production of chickpea & pigeonpea through Intensive application of Integrated Pest Management. 2010-12 Accelerated Pulses Production Programme. O P Sharma National Centre for Integrated Pest Management LBS Building, IARI Campus, New Delhi-110012. Objectives.

iliana
Télécharger la présentation

2010-12 Accelerated Pulses Production Programme

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Increasing production of chickpea & pigeonpea through Intensive application of Integrated Pest Management 2010-12 Accelerated Pulses Production Programme O P Sharma National Centre for Integrated Pest Management LBS Building, IARI Campus, New Delhi-110012

  2. Objectives

  3. Activities (units) for 2010-12 1 unit = 1000ha

  4. Cooperating Institutions

  5. Status of inputs supplied to beneficiaries under A3P being implemented by NCIPM in collaboration with SAUs.

  6. Karnataka Disease reporting

  7. Maharashtra

  8. Parbhani Parbhani Nanded

  9. Osmanabad Incidence of diseases was very less due to large scale adoption of BSMR varieties

  10. Andhra Pradesh Insect pest scenario Diseases Met week (Nov)

  11. Uttar Pradesh

  12. Hamirpur Banda

  13. Madhya Pradesh

  14. Chhindwara

  15. Human Resource Development About the crop, Hollistic crop care, Key pests of pigeonpea and online data feeding in e-pest reporting system.

  16. Seed treatment with PSB + Rhizobium Seed treatment with Trichoderma

  17. e - National Pest Reporting and Alert System http://www.ncipm.org.in/A3P/UI/HOME/Login.aspx

  18. Register Scout information

  19. Tracking report Scout survey information data entry

  20. Temporal reports (Tabular format) Current Pest report reports

  21. Taluk-wise Graphical report presentation

  22. GIS presentation for Nanded centre

  23. GIS presentation for Parbhani centre

  24. View Advisory

  25. Send Advisory

  26. Screen shot of Advisories sent via SMS to Farmers

  27. Excessive rain led to higher incidence of leaf roller Leaf roller Maruca

  28. Excessive rain led to Cercospora disease ….. Leading to flower drops (up to 50% in extreme cases) Farmers were advised to spray carbadenzim 2%

  29. Damaged pod with live larvae Damaged pod with NPV affected larvae

  30. Methodology of e- Pest Surveillance • Survey conducted 4 days in a week in which 3 days for fixed survey and one day for rapid roving survey • Fixed survey in 34 villages (Two spots / village ) – 3 days a week • Random survey in the whole district 40 spots / day by four teams once in a week • After survey is over, all the information was pooled on friday and recommendations given on Saturday (over phone & SMS) as forewarning to undertake management practices Mean, Percentage & Frequency distribution

  31. Status of Helicoverpa eggs at different stages of crop (2010)

  32. Status of Helicoverpa larval incidence (2010)

  33. Status of other pests (2010) Maruca Pod bug Pod fly

  34. Status of beneficial and eco-friendly pesticides New molecules Indoxacarb, Spinosad, Emamectin benzoate, flubendiamide, Rynaxypyr Bio-pesticides Neem and HaNPV

  35. Future programme • Modification of the programmebased on feedback and experiences of 2010. • Development of “Timelines” and strengthening of co-operation with State AgriDeptt with especial reference to UP and MP. • Strengthening of e-Pest Surveillance programme through engagement of temporary scouts. • Expansion of programme in Karnataka with the help of KVKs.

  36. Thank you

More Related