U.S. Army Materiel Command

CSC MRO Case Studies. LOGISTICS MODERNIZATION PROGRAM. U.S. Army Materiel Command. AMC – Army READINESS Command… Supporting Every Soldier Every Day. CSC MRO Case Studies. Contract Information. Contract Awarded 29 Dec 99 Period of Performance Dec 99 – Dec 09

ilyssa
Télécharger la présentation

U.S. Army Materiel Command

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC MRO Case Studies LOGISTICS MODERNIZATION PROGRAM U.S. Army Materiel Command AMC – Army READINESS Command… Supporting Every Soldier Every Day

  2. CSC MRO Case Studies Contract Information • Contract Awarded 29 Dec 99 • Period of Performance Dec 99 – Dec 09 • Type of Contract – FFP Plus Performance Bonus PRIME CONTRACTOR Computer Sciences Corporation Moorestown, NJ MAJOR SUBCONTRACTORS GRC International; IBM; KPMG LLP; Metters Industries; SIGNAL Corporation Raytheon; ERP vendor - SAP

  3. CSC MRO Case Studies US Army Logistics Modernization Plan Revolutionary Integrated Business Processes to Achieve -Total Asset Visibility and Velocity Management…Maintenance Management…Enhanced Decision Support Capabilities… Collaborative Planning Environment…Improved Advanced Planning… Single Actionable Source of Data…Forecasting Accuracy…Real Time…Easily Accessible and Flexible D A T A Enhanced Decision Support Capability Accurate Complete Current Available Logistics Product Data Requirements Determination Asset Management Materiel Maintenance Financial Management Performance Measurement and Feedback Supply Chain Optimization Customers Vendors Readiness

  4. IMMC WS/Item Mgr CCSS (RD&ES) Maint. Rqmt. IMMC Maint. Prog. Mgr. CCSS (MDMS) Maint. Prgm. Maint. Prgm. HAS OSC Depot Production Controller Accepted Maint. Prgm. SDS Accepted Maint. Prgm. HAS OSC IMMC Maint. Prog. Mgr. Funded Maint. Prgm. CCSS (MDMS) Funded Maint. Prgm. HAS OSC Prgm. Initiated (Parts Ordered, Labor Sched., etc.) Depot Production Controller SDS Shop Floor CSC MRO Case Studies Example Of a Reengineered Process Depot Maintenance Workloading Current Process Future Process Full Collaboration & Visibility Shared Data (Single Source) Collaboration Plan HQS AMC Online Notification Manage WS/Item Mgr. Integrated Planning & Execution Maintenance Prog. Mgr. Production. Controller Singular Process Schedule Real time Integrated Financials Shop Floor Execute WLMP ERP Environment Batch Processing, Multiple Data Sources, Quarterly Program Reviews w/AMC

  5. CSC MRO Case Studies …SAP MRO Solution Map & Public Sector functionality is being driven by the US Army LMP implementation Source: SAP.com

  6. CSC MRO Case Studies GDLS MRO Project Goals • Build on last years work • Use GDLS stated vision to frame MRO process definition • Take requirements, process and functionality to next level of detail • Confirm with major MRO program users • Provide MRO best practice incorporated into solution and introduce to program personnel • Evaluate the selection of Oracle Complex MRO to GDLS requirement • Start Catalyst design phase • Develop go forward plan, identify key issues and start ROM cost

  7. CSC MRO Case Studies MRO Business Area Description MRO Conceptual Flow Diagram Shows the overall processes and flows involved in this business area and bounds this portion of the project. Drill down deliverable based on this high level functionality and Oracle MRO evaluated to these requirements

  8. CSC MRO Case Studies MRO Process Reengineering Through Common Integrated Processes, Data, and Systems • Goals • Inventory turns improvement • Employee productivity • Material cost reduction • Part delivery fill rate increase • Lower quality escapes • Revenue growth Processes In Scope Core finance Configuration management and customer technical data • The Complexity of Change • 800 redesigned business processes • Over 60 internal organizations impacted • 500 new or modified work procedures • Over 700 legacy systems • Approximately 22,000 end users • Over 1,000 SAP transactions Procurement Component manufacturing/repair Engine sales, assembly Program management Sales and distribution warehousing Human resources Source: www.SAP.com

  9. CSC MRO Case Studies • CSC at Regional Aircraft  • CSC provided BAe's Regional Aircraft business unit with an SAP system to produce accurate, real-time financial and performance monitoring information at any time, and to complete month-end account processing within one day, at less cost than current systems. • Regional Aircraft launched a second phase of Project Zephyr to implement the Production Planning module and further exploit the modules implemented in Phase 1 to enable the existing legacy systems for Manufacturing Logistics and Aircraft Purchasing to be replaced. • Successful go-live of Phase 2 was achieved and, again in partnership with the client, CSC installed and implemented the SAP Sales and Distribution module • CSC at BAe Airbus   • CSC is providing the BAe Airbus with improved supply chain manufacturing processes. Work is divided into three streams: IS covering infrastructure and interfaces/migration, enterprise integration and organizational change/training. • CSC at BAe Royal Ordnance • At BAe’s Royal Ordnance business unit CSC is helping that unit implement the RO IT strategy. This has to support RO operating in partnerships or JVs. Consequently, the technology being installed has to support the flexible configuration of the core business systems now being implemented across RO’s product based business units. • CSC at BAe Systems & Services • There have been a number of SAP modules implemented in S&S with still more planned. The team consists of a collocated and combined group of CSC Professional Services, CSC TMU, BAe Systems and Support business and technical staff from the United Kingdom (UK) and the Kingdom of Saudi Arabia (KSA) and third party consultancy groups. Here is brief summary of those events: