An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Concrete Batch PlantsApplicability of EPC Local RulesMarch 30, 2010 Jason Waters, P.E. Environmental Protection Commission of Hillsborough County (EPCHC)

  2. Public Notification • Public Notice Requirements • EPC Rule 1-3.24, Paragraph 2. General and Relocatable Permits. • Facility must pick up and post the sign within 5 days of submitting notification to EPC, and the sign must remain posted for 30 days, or for the duration of the operation if it is less than 30 days.

  3. Visible Emissions Tests EPC RULE 1-3.52, VISIBLE EMISSIONS • 20% Hillsborough County-All Sources • 5% Hillsborough County-Material Handling Sources • Annual VE requirement for all permitted sources subject to this section or Rule 62-296.320(4)(b)1., F.A.C.

  4. Contact EPC Air Compliance at: 813-627-2600 • Website: www.epchc.org

  5. Questions